2013 |
Date |
Lead |
PROJECT |
Instrument |
Plan |
Status |
Runtime Report |
| Oct 18b | TBD | TBD | TBD | ||||
| Oct 14a | TBD | TBD | MOSFIRE | ||||
| Oct 13a | TBD | TBD | MOSFIRE | ||||
| Sep 21 | Stomski | E327OL: AO SC for TRICK (2 hr) | OSIRIS-L | ||||
| Ragland | E333N2: Improved LBWFS-low order aberrations (4.5 hour) | OSIRIS-L | |||||
| Lyke | E336OL: K1 LGSAO characterization (3.5 hr) | OSIRIS-L | |||||
| Aug 30b | TBD | TBD | MOSFIRE | ||||
| Aug 29b | TBD | Give-Back Science | TBD | ||||
| Aug 23b | Doppmann | E325Hr: HIRES non-sidereal guiding | HIRESr | ||||
| Aug 22b | Stomski | E327O: AO SC for TRICK (2 hr) | OSIRIS-N | post-SegEx | |||
| Aug 21b | Kwok | E328X: Nod and shuffle guiding (2 hr) | HIRESr | post-SegEx | |||
| July 22 | Stomski | E335OL: AO SC for Trick (2hr) | OSIRIS-L | ||||
| Lyke | E346OL: K1LGS/OSIRIS Characterization (8hr) | OSIRIS-L | |||||
| July 21 | TBD | Give-Back Science | TBD | ||||
| June 17 | Stomski | E335OL: AO SC for Trick (2hr) | OSIRIS-N | ||||
| Lyke | E346OL: K1LGS/OSIRIS Characterization (8hr) | OSIRIS-L | |||||
| May 03a | Stomski | E335OL: AO SC for Trick (2hr) | OSIRIS-N | ||||
| Kwok | E342LA: KCWI nod & shuffle (2hr) | HIRES | s/w not ready | ||||
| Apr 05a | Panteleev | Phasing (1.5hr) | PCS | ||||
| Kwok | KCWI nod & shuffle (1.5hr) | OSIRIS-N | |||||
| Stomski | AO SC for TRICK (2hr) | ||||||
| Feb 25 | Panteleev | K1 PCS post-upgrade tests (5.5hr) | PCS | ||||
| Kwok | KCWI nod & shuffle (2hr) | ||||||
| Stomski | AO SC for TRICK (2hr) | OSIRIS-N | |||||
| Feb 24 | Panteleev | Phasing (1.5hr) | PCS | ||||
| Panteleev | K1 PCS post-upgrade tests (5.5hr) | ||||||
| Stomski | AO SC for TRICK (2hr) | OSIRIS-N | |||||
| Feb 14 | L. Cowie | Science H292M | MOSFIRE | ||||
| Feb 13 | Kassis | MOSFIRE engineering | MOSFIRE | ||||
| Feb 12 | Campbell/Lyke | OSIRIS engineering | OSIRIS-L | ||||
| Stomski | AO SC for TRICK (1hr) | ||||||
| Feb 07b | Rizzi | LRIS engineering | LRIS | ||||
| Jan 20 | Panteleev | Phasing (1.5hr) | PCS | ||||
| R. Campbell | OSIRIS new grating checkout (9.5hr) | OSIRIS-N | |||||
2012 |
Date |
Lead |
PROJECT |
Instrument |
Plan |
Status |
Runtime Report |
| Dec 03 | TBD | Give-Back Science | TBD | ||||
| Dec 02a | TBD | Give-Back Science | HIRES | ||||
| Dec 02b | Panteleev | Phasing (1.5hr) | PCS | ||||
| K1 SUFS (1.5hr) | |||||||
| R. Cohen | ACS release (0.5hr) | ||||||
| Krasuski | Pointing tests (2hr) | SSC | |||||
| Nov 27 | Armandroff | TK Science | MOSFIRE | ||||
| Nov 26 | Kassis | MOSFIRE engineering | MOSFIRE | ||||
| Nov 08b | L. Rizzi | Test IQM, measure POs (3hr) | LRIS | ||||
| S. Kwok | KCWI nod & shuffle (2.5hr) | ||||||
| Oct 30 | Wizinowich | K1 LGS-AO Engineering | OSIRIS-L | ||||
| Oct 29 | Panteleev | Seg rewarp & Phasing | PCS | ||||
| K1 SUFS | |||||||
| Cohen | ACSU test & release (1hr) | contingency for ACSU | |||||
| Sep 09 | Kassis | MOSFIRE engineering | MOSFIRE | ||||
| Cohen | ACSU test & release (1hr) | PCS | release ACSU if ok on 9/4 | ||||
| Sep 04b | Panteleev | Seg rewarp & Phasing | PCS | ||||
| Cohen | ACSU test (1hr) | ||||||
| Aug 02 | Panteleev | Seg rewarp & Phasing (2hr) | PCS | phasing only after rewarp | |||
| Wizinowich | K1 LGS-AO Engineering | OSIRIS-L | |||||
| Jul 27 | Panteleev | Phasing | PCS | ||||
| Woillez, Ragland | ASTRA/V2 Engineering | ASTRA/V2 | |||||
| Jun 27 | Kassis | MOSFIRE commissiong | MOSFIRE | ||||
| Jun 26 | Kassis | MOSFIRE commissiong | MOSFIRE | ||||
| Jun 03 | Kassis | MOSFIRE commissiong | MOSFIRE | ||||
| Jun 02 | Kassis | MOSFIRE commissiong | MOSFIRE | ||||
| Jun 01 | Kassis | MOSFIRE commissiong | MOSFIRE | ||||
| May 10 | Lyke | OSIRIS K1 commissiong | OSIRIS-L | ||||
| May 09 | Lyke | OSIRIS K1 commissiong | OSIRIS-L | ||||
| May 06 | Kassis | MOSFIRE commissiong | MOSFIRE | ||||
| May 05 | Kassis | MOSFIRE commissiong | MOSFIRE | ||||
| May 04 | Kassis | MOSFIRE commissiong | MOSFIRE | ||||
| Apr 29 | Panteleev | Phasing | PCS | ||||
| Woillez, Ragland | ASTRA/V2 Engineering | ASTRA/V2 | |||||
| Apr 05 | Kassis | MOSFIRE commissiong | MOSFIRE | ||||
| Apr 04 | Kassis | MOSFIRE commissiong | MOSFIRE | ||||
| Apr 03 | Lyke | OSIRIS K1 commissiong | OSIRIS | ||||
| Apr 02 | Lyke | OSIRIS K1 commissiong | OSIRIS | ||||
| Mar 11 | Lyke | OSIRIS K1 commissiong | OSIRIS | ||||
| Mar 10 | Panteleev | Phasing | PCS | ||||
| Lyke | OSIRIS K1 commissiong | OSIRIS | |||||
| Mar 03 | TBD | Give-Back Science | HIRES | contingent on successful MAGIQ commissioning | |||
| Mar 02 | Lyke | OSIRIS engineering | OSIRIS-N | ||||
| TBD | Give-Back Science | HIRESr | contingent on successful MAGIQ commissioning | ||||
| Mar 01 | Dahm | MAGIQ post-installation engineering | HIRESr | ||||
| Lyke | OSIRIS engineering | OSIRIS-N | contingent on successful MAGIQ commissioning | ||||
| Feb 15 | Kassis | LRIS engineering | LRIS | ||||
| Mader | k1server upgrade | software release; no sky time | |||||
| Feb 11 | Wizinowich | K1 LGS, FST | |||||
| Feb 09a | TBD | Give-Back Science | HIRES | ||||
| Feb 08a | Panteleev | Phasing | PCS | ||||
| Panteleev | Phase-stacking crosstalk (1.25hr) | PCS | |||||
| Woillez | ASTRA/V2 Engineering | ASTRA/V2 | |||||
2011 |
Date |
Lead |
PROJECT |
Instrument |
Plan |
Status |
Runtime Report |
| Proposals for 2011B Q2 | |||||||
| Jan 02 | Panteleev | Phasing | PCS | ||||
| Wizinowich | K1 LGS, FST | SHARC-L | |||||
| Dec 31a | Kassis | LRIS engineering | LRIS | ||||
| Dec 13 | Wizinowich | K1 LGS, FST | SHARC-L | ||||
| Dec 11 | Panteleev | Phasing | PCS | ||||
| Wizinowich | K1 LGS, FST | SHARC-L | |||||
| Nov 05a | Ragland | V2 SPR Engineering | V2 SPR | ||||
| Nov 04a | Panteleev | Phasing | PCS | ||||
| Ragland | ASTRA/V2 Engineering | ASTRA/V2 | |||||
| Proposals for 2011B Q1 | |||||||
| Oct 19 | Wizinowich | K1 LGS, FST | SHARC-L | ||||
| Oct 18 | TBD | Give-Back Science | HIRES | ||||
| Oct 17 | TBD | Give-Back Science | HIRES | ||||
| Oct 14a | Engineering | SegEx | PCS | ||||
| Oct 13 | Engineering | SegEx | PCS | ||||
| Oct 12 | Engineering | SegEx | PCS | ||||
| Oct 09 | Ragland | IF engineering | ASTRA/V2 | ||||
| Sep 18 | Wizinowich | K1 LGS, FST | SHARC-L | ||||
| Sep 17 | Kassis | LRIS engineering | LRIS | ||||
| Sep 16 | Engineering | SegEx | PCS | ||||
| TBD | Give-Back Science | HIRES | |||||
| Sep 15 | Engineering | SegEx | PCS | ||||
| Sep 14 | Engineering | SegEx | PCS | ||||
| Sep 10 | Ragland | IF engineering | ASTRA/V2 | ||||
| Sep 09 | TBD | Give-Back Science | HIRES | ||||
| Sep 08 | TBD | Give-Back Science | HIRES | ||||
| Sep 07 | Cohen | ACS upgrade testing | PCS | ||||
| Panteleev | T447 UFS of warped segments | ||||||
| Krasuski | T1050 Open Loop Tracking | SSC | |||||
| Aug 12 | Krasuski | TCSU K2 pointing & compensation | SSC | ||||
| Aug 11a | Engineering | SegEx | PCS | ||||
| Aug 10 | Engineering | SegEx | PCS | ||||
| Aug 09 | Engineering | SegEx | PCS | ||||
| Proposals for 2011A Q2 | |||||||
| Jul 17 | MOSFIRE commissioning | MOSFIRE | |||||
| Jul 16 | MOSFIRE commissioning | MOSFIRE | |||||
| Jul 15 | Panteleev | K1 alignment and recovery | PCS | ||||
| E.Chock | HIRES server upgrade | HIRES | most likely not needed; to be confirmed by 6/1 | ||||
| Jul 14 | shutdown | ||||||
| Jul 13 | shutdown | ||||||
| Jul 12 | shutdown | ||||||
| Jun 23a | IF Engineering | IF - Nuller | |||||
| Jun 23b | Ragland | Single-disk K-band nulling | IF - Nuller | ||||
| Kwok | Fix SSC guiding | SSC | |||||
| Jun 19 | MOSFIRE commissioning | MOSFIRE | these nights are not quite settled yet. subject to change. | ||||
| Jun 18 | MOSFIRE commissioning | MOSFIRE | |||||
| Jun 17 | MOSFIRE commissioning | MOSFIRE | |||||
| Jun 16a | Engineering | SegEx | PCS | ||||
| Jun 15 | Engineering | SegEx | PCS | ||||
| Jun 14 | Engineering | SegEx | PCS | ||||
| Jun 11 | Ragland | ASTRA engineering | IF | ||||
| IF Engineering | IF - V2 | ||||||
| May 26 | Chin | FST | SHARC-L | ||||
| May 20 | Chin | FST | SHARC-L | ||||
| May 19 | Ragland | ASTRA Engineering | IF V2-DFPR | ||||
| May 13 | Kwok | Fix SSC guiding | SSC | ||||
| Krasuski | Pointing test | SSC | |||||
| Engineering | SegEx | PCS | |||||
| May 12 | Engineering | SegEx | PCS | ||||
| May 11 | Engineering | SegEx | PCS | ||||
| Proposals for 2011A Q1 | |||||||
| Apr 24 | Stalcup | K1 FST and LGS commissiong | SHARC-L | ||||
| Apr 23 | Ulander | TCSU Upgrade | HIRES | ||||
| Dahm | HIRES Spectral Atlas | ||||||
| L. Chock | HIRESServer Upgrade | ||||||
| Apr 15a | Panteleev | Phasing (1.5hr) | PCS | ||||
| Engineering | SegEx | PCS | |||||
| Apr 14 | Engineering | SegEx | PCS | ||||
| Apr 13 | Engineering | SegEx | PCS | ||||
| Apr 11 | Stalcup | K1 FST and LGS commissiong | SHARC-L | ||||
| Mar 21a | IF | IF engineering | V2-Lband | ||||
| Mar 19 | Panteleev | Phasing (1.5hr) | PCS | ||||
| Woillez | ASTRA engineering | IF | |||||
| Mar 15 | Stalcup | K1 FST and LGS commissiong | SHARC-L | ||||
| Feb 15a | Stalcup | K1 FST | SHARC | ||||
| Feb 15b | Vogt | Give-Back Science | HIRES | ||||
| Feb 12a | Panteleev | Phasing (1.5hr) | PCS | ||||
| IF | IF engineering | Nuller | |||||
| Proposals for 2010B Q2 | |||||||
| Jan 21 | Woillez | ASTRA DFPR | IF | ||||
| Panteleev | Phasing (1.5hr) | PCS | |||||
| Jan 20a | Woillez | ASTRA | |||||
| Jan 15 | LRIS-R commissiong #3 | LRIS | contingency | ||||
| Jan 14 | LRIS-R commissiong #3 | LRIS | contingency | ||||
2010 |
Date |
Lead |
PROJECT |
Instrument |
Plan |
Status |
Runtime Report |
| Dec 22 | Panteleev | Phasing (1.5hr) | PCS | ||||
| Woillez | ASTRA DFPR | IF | |||||
| Dec 16 | Kassis | LRIS-R commissiong #3 | LRIS | ||||
| Dec 15 | Kassis | LRIS-R commissiong #3 | LRIS | ||||
| Dec 02b | Panteleev | LRIS MAGIQ IQM | LRIS | ||||
| Dec 01a | Dahm | Exposure meter calibration | HIRES | ||||
| Nov 26 | TBD | Give-Back Science | HIRES | ||||
| Nov 25b | Krasuski | TCSU Azimuth Control Loop | HIRES | ||||
| Kwok | SSC guiding | SSC | |||||
| Nov 23a | Ragland | V2-SPR | IF | ||||
| Nov 22 | Panteleev | Phasing (1.5hr) | PCS | ||||
| Woillez | ASTRA DFPR | IF | |||||
| Nov 18 | TBD | Give-Back Science | HIRES | ||||
| Nov 17 | TBD | Give-Back Science | HIRES | ||||
| Proposals for 2010B Q1 | |||||||
| Oct 29b | TBD | Give-Back Science | HIRES | ||||
| Oct 29a | Panteleev | Phasing (1.5hr) | PCS | ||||
| Engineering | SegEx | PCS | |||||
| Oct 28 | Engineering | SegEx | PCS | ||||
| Oct 27 | Engineering | SegEx | PCS | ||||
| Oct 24a | Tytler | Give-Back Science | HIRES | ||||
| Oct 21b | Krasuski | TCSU Fine Acquisition & Azimuth tuning | SSC | ||||
| Oct 18a | Woillez | ASTRA DFPR | IF | ||||
| Oct 18b | TBD | Give-Back Science | HIRES | ||||
| Oct 17 | R. Berstein | Give-Back Science | HIRES | ||||
| Sep 17b | Panteleev | Phasing (1.5hr) | PCS | ||||
| Ragland | Single dish K-band feasibility | IF | |||||
| Sep 14 | Panteleev | MAGIQ IQM | LRIS | ||||
| Proposals for 2010A Q2 | |||||||
| Jul 20b | Panteleev | Phasing (1.5hr) | PCS | ||||
| Woillez | V2 | V2 | |||||
| Jul 19 | Woillez | ASTRA | ASTRA | ||||
| Ulander | MOSFIRE local controls Modifications | K1 | Daytime test only, no skytime | ||||
| May 29b | Panteleev | Phasing (1.5hr) | PCS | ||||
| Ragland | L-band science mode characterization | Nuller | |||||
| May 07b | Tran | LRISp blue characterization | LRISp | ||||
| Panteleev | MAGIQ IQM (2hr) | ||||||
| Proposals for 2010A Q1 | |||||||
| Apr 30b | TBD | Give-Back Science | TBD | ||||
| Apr 28b | T. Stalcup | K1 LGS Engineering | SHARC-L | ||||
| Apr 23a | Panteleev | Phasing (1.5hr) | PCS | ||||
| Woillez | ASTRA DFPR (4 hr) | IF | |||||
| Apr 22 | T. Stalcup | K1 LGS Engineering | SHARC-L | ||||
| Woillez | ASTRA/Phasing | IF | |||||
| Apr 01 | TBD | Give-Back Science | TBD | ||||
| Mar 31 | T. Stalcup | K1 LGS Engineering | SHARC-L | ||||
| Kwok | HIRES MAGIQ guider tests | HIRES | |||||
| Mar 30 | Woillez | ASTRA DFPR | IF | ||||
| Feb 27 | T. Stalcup | K1 LGS Engineering | SHARC-L | ||||
| Feb 24b | Panteleev | Phasing (1.5hr) | PCS | ||||
| Panteleev | IQ and Throughput (0.25hr) | SSC | T1030 | ||||
| Dahm/Kwok | HIRES Magiq guiding (2hr) | HIRES | |||||
| Woillez | ASTRA T/T metrology (2hr) | IF - K1 | |||||
| Proposals for 2009B Q2 | |||||||
| Jan 31 | T. Stalcup | K1 LGS Engineering | SHARC | ||||
| Jan 28 | T. Stalcup | K1 LGS Engineering (5.5hr) | SHARC | K1 LGS first light! | 1/2 night done | nightlog | |
| Dahm | HIRES MAGIQ engineering (4hr) | HIRES | done | ||||
| S. Panteleev | Pointing, and throughput tests (2hr) | T1030, 1038 | |||||
| Jan 23a | S. Panteleev | Phasing (1.5hr) | PCS | ||||
| T. Stalcup | K1 NGS-AO Engineering | SHARC | |||||
| S. Panteleev | Focus vs. Elevation (2hr) | HIRES | done Jan 02 | nightlog | |||
| S. Dahm | Iodine cell MAGIQ guiding (1hr) | done Jan 02 | nightlog | ||||
| T. Krasuski | Pointing tests | not done | |||||
| Jan 22 | S. Panteleev | Focus vs. Elevation (2hr) | LRIS | ||||
| S. Panteleev | LRIS IQM calibration (1hr) | ||||||
| M. Kassis | LRIS Differential Flexure (8hr) | ||||||
| Jan 02 | T. Stalcup | K1 LGS Engineering | SHARC | half night done | nightlog | ||
2009 |
Date |
Lead |
PROJECT |
Instrument |
Plan |
Status |
Runtime Report |
| Dec 29 | S. Panteleev | Phasing (1.5hr) | PCS | ||||
| J. Woillez | ASTRA DFPR | IF | |||||
| Dec 13a | J. Woillez | ASTRA DFPR (single dish) | IF | ||||
| Dec 04 | TBD | Give-Back Science | TBD | ||||
| Dec 03 | TBD | Give-Back Science | TBD | ||||
| Nov 23b | S. Panteleev | Phasing (1.5hr) | PCS | ||||
| R. Cohen | PMFM vs. Elevation (2hr) | ||||||
| T. Krasuski | High EL tracks (1hr) | ||||||
| R. Cohen | Testing PMFM (1hr) | ||||||
| Nov 07a | TBD | Give-Back Science | HIRES | ||||
| Proposals for 2009B Q1 | |||||||
| Oct 30 | CIT | Give-Back Science | HIRESr | ||||
| Oct 26b | T. Stalcup | K1 NGS Engineering | SHARC | ||||
| E. Chock | SW release | ||||||
| Oct 24a | IF Engineering | IF Engineering | Nuller | ||||
| Oct 24b | S. Panteleev | Phasing (1.5hr) | PCS | ||||
| S. Panteleev | Phasing LE baffles (1hr) | PCS | |||||
| S. Ragland | Single-dish K-band nulling (2hr) | IF | |||||
| E. Chock | SW release | ||||||
| Sep 27a | M. Kassis | Differential flexure | LRIS | not done due to thick clouds | nightlog | ||
| E. Chock | SW release | ||||||
| Aug 28 | T. Stalcup | K1 NGS Engineering | SHARC | only ~1hr done, rest of night lost to weather | |||
| J. Woillez | ASTRA DFPR | IF | nightlog | ||||
| Aug 13b | M. Kassis | MAGIQ offset guider | LRIS | done | nightlog | ||
| Aug 10b | S. Panteleev | Phasing (1.5hr) | PCS | not much done due to technical problems | nightlog | ||
| T. Stalcup | K1 NGS Engineering (3hr) | SHARC | |||||
| Sat | Apr 04a | S. Panteleev | Phasing (1.5hr) | PCS | not done due to clouds | nightlog | |
| T. Stalcup | K1 NGS 5x5 STRAP (1.5hr) | SHARC | work hampered by clouds | nightlog | |||
| T. Stalcup | K1 NGS DAR testing (1hr) | SHARC | |||||
| T. Stalcup | K1 NGS launch tel alignment (1.5hr) | SHARC | |||||
| Sat | Mar 14 | M. Kassis | MAGIQ offset guider | LRIS | commissioning plan | entire night lost to weather | |
| Thu | Mar 12 | M. Kassis | LRIS | commissioning plan | postponed | ||
| S. Panteleev | Phasing (1.5hr) | PCS | night wiped out by weather | ||||
| S. Kwok | Pointing tests | SSC | |||||
| T. Stalcup | K1 NGS AO Engineering | SHARC | |||||
| Wed | Mar 11a | T. Stalcup | K1 NGS 20x20 STRAP (2hr) | SHARC | time lost to weather
|
||
| T. Stalcup | K1 NGS TSS field curvature (3hr) | SHARC | |||||
| Sat | Mar 07a | S. Panteleev | Phasing (1.5hr) | PCS | night lost to weather | ||
| T. Stalcup | K1 NGS STRAP | SHARC | retry of Feb 10 | ||||
| T. Stalcup | K1 NGS AO Performance | SHARC | retry of Feb 10 | ||||
| T. Krasuski | TCSU tests | PCS | |||||
| Sat | Feb 14 | M. Kassis | MAGIQ slit guider | LRIS | commissioning plan | done | nightlog |
| L. Chock | New DCS release (no sky time) | ||||||
| Thu | Feb 12 | M. Kassis | MAGIQ slit guider | LRIS | commissioning plan | done | nightlog |
| Tue | Feb 10a | K. Ulander | Local controls PLC (no sky time) | entire night lost to weather | |||
| S. Panteleev | Phasing (1.5hr) | PCS | |||||
| T. Stalcup | K1 NGS STRAP (2hr) | SHARC | |||||
| T. Stalcup | K1 NGS AO Performance (2hr) | SHARC | |||||
| Tue | Feb 10b | Boden | Give-Back Science | HIRES | |||
| Tue | Jan 13 | M. Kassis | LRIS Engineering | LRIS | |||
| Thu | Jan 08b | S. Panteleev | Phasing, IQ and Throughput (1.8hr) |
PCS, SSC | |||
| T. Krasuski | Encoder & analog board tests (3.7hr) | ||||||
| Wed | Jan 07 | Endl | Give-Back Science | HIRES | |||
| Sat | Jan 03 | Fischer | Give-Back Science | HIRES | |||
| Fri | Jan 02 | Butler | Give-Back Science | HIRES | |||
| Thu | Jan 01 | Hillenbrand | Give-Back Science | HIRES | |||
2008 |
Date |
Lead |
PROJECT |
Instrument |
Plan |
Status |
Runtime Report |
| Tue | Dec 16 | K. Tsubota | K1server upgrade (1hr) | ||||
| R. Matsuda | K1 dome bogie repair | ||||||
| Mon | Dec 15 | R. Matsuda | K1 dome bogie repair |
||||
| Wed | Dec 10b | S. Panteleev | Phasing (1.5hr) |
PCS, SSC | Phasing to be done in IF 1st half | night lost to weather | |
| Butler | Give-Back Science | HIRES | |||||
| Thu | Nov 20 | Djorgovski | Give-Back Science | HIRES | |||
| Tue | Nov 18 | Smecker-Hane | Give-Back Science | HIRES | |||
| Sat | Nov 15b | Jura | Give-Back Science | HIRES | |||
| Sun | Nov 09b | S. Panteleev | Phasing, IQ and Throughput (1.8hr) |
PCS, SSC | done | ||
| T. Krasuski | Encoder & analog board tests (3.7hr) | done | nightlog | ||||
| Sat | Nov 08 | TBD | Give-Back Science | HIRES | |||
| Thu | Aug 14b | S. Panteleev | Phasing | PCS | |||
| S. Ragland | L-band Science Verification | IF | |||||
| Thu | Aug 07 | TBD | Give-Back Science | HIRES | |||
| Sun | Jul 27 | T. Krasuski | Spare telescope controller cards | HIRESr | Pointing tests will not be done, as Heidenhain encoders won't be installed in time. | ||
| TBD | Give-Back Science | ||||||
| Sun | Jul 20 | J. Woillez | ASTRA SPR | IF | |||
| Sat | Jul 19 | Vogt | Give-Back Science | HIRESr | |||
| Fri | Jul 18 | Butler | Give-Back Science | HIRESr | |||
| Thu | Jul 17 | Simon | Give-Back Science | HIRESr | |||
| Sat | Jul 12b | S. Panteleev | Phasing | PCS | Phasing to be done during configuration change | ||
| J. Woillez | ASTRA SAT (2hr) | IF | |||||
| J. Woillez | ASTRA SPR (2.5hr) | ||||||
| Fri | Jun 27a | M. Kassis | MAGIQ (3hr) | LRIS | |||
| M. Kassis | Slitmask improvement (1.5hr) | ||||||
| Wed | Jun 25 | Fischer | Give-Back Science | HIRESr | |||
| Tue | Jun 24 | S. Kwok | MAGIQ | HIRESr | |||
| G. Hill | HIRES Throughput | ||||||
| Mon | Jun 23 | Marcy | Give-Back Science | HIRESr | |||
| Tue | May 27a | T. Krasuski | Pointing tests (1.5hr) | LRIS | done | nightlog | |
| M. Kassis | MAGIQ (3hr) | done | nightlog | ||||
| Fri | May 23b | S. Panteleev | Phasing (1.5hr) | PCS | |||
| J. Woillez | ASTRA SPR (3hr) | IF | |||||
| Tue | Apr 22b | S. Ragland | Validation of L-band mode (1hr) | IF | |||
| S. Kwok | MAGIQ (4hr) | HIRES | report | ||||
| Sat | Apr 12b | S. Panteleev | Phasing (1.5hr) | PCS | T962a | ||
| Pott | ASTRA angle tracking (1hr) | IF | |||||
| J. Woillez | ASTRA (2.5hr) | IF | |||||
| Fri | Mar 14b | S. Panteleev | Phasing (1.5hr) | PCS | T962a | ||
| S. Panteleev | Focus vs. elevation (2hr) | HIRES | T464 | ||||
| S. Panteleev | Focus vs. rotation (2hr) | HIRES | T980 | ||||
| Mon | Feb 18b | Pott | ASTRA angle tracking (1hr) | IF | done | report | |
| J. Woillez | ASTRA (4.5hr) | IF | done | ||||
| Thu | Feb 14b | S. Panteleev | Phasing (1.5hr) | PCS | T962a | done | |
| S. Kwok | MAGIQ and Pointing (4hr) | HIRES | done | nightlog | |||
| Tue | Jan 22 | Herczeg | Give-Back Science | HIRESr | |||
| Mon | Jan 21 | Herczeg | Give-Back Science | HIRESr | |||
| Sun | Jan 20 | G. Chanan | Phasing + new PCS algorithm (11hr) | PCS | done | nightlog | |
2007 |
Date |
Lead |
PROJECT |
Instrument |
Plan |
Status |
Runtime Report |
| Sun | Dec 30 | Johnson | Give-Back Science | HIRES | |||
| Sat | Dec 29 | S. Panteleev | Phasing (1.5hr) | PCS | done | ||
| Laughlin | Give-Back Science | HIRES | |||||
| Mon | Dec 03b | S. Panteleev | Instrument guider calibration (0.6hr) | LRIS | |||
| M. Kassis | LRIS offset guider PO and image quality (5hr) | LRIS | done | nightlog | |||
| Mon | Nov 26b | S. Panteleev | Phasing, IQ and throughput | PCS/SSC | entire night lost to weather | ||
| J. Woillez | ASTRA (1.25hr) | IF | |||||
Old Schedules