2013

Date
Lead
PROJECT
Instrument
Plan
Status
Runtime Report
  Oct 18b TBD TBD TBD      
  Oct 14a TBD TBD MOSFIRE      
  Oct 13a TBD TBD MOSFIRE      
  Sep 21 Stomski E327OL: AO SC for TRICK (2 hr) OSIRIS-L      
  Ragland E333N2: Improved LBWFS-low order aberrations (4.5 hour) OSIRIS-L      
  Lyke E336OL: K1 LGSAO characterization (3.5 hr) OSIRIS-L      
  Aug 30b TBD TBD MOSFIRE      
  Aug 29b TBD Give-Back Science TBD      
  Aug 23b Doppmann E325Hr: HIRES non-sidereal guiding HIRESr      
  Aug 22b Stomski E327O: AO SC for TRICK (2 hr) OSIRIS-N post-SegEx    
  Aug 21b Kwok E328X: Nod and shuffle guiding (2 hr) HIRESr post-SegEx    
  July 22 Stomski E335OL: AO SC for Trick (2hr) OSIRIS-L      
  Lyke E346OL: K1LGS/OSIRIS Characterization (8hr) OSIRIS-L      
  July 21 TBD Give-Back Science TBD      
  June 17 Stomski E335OL: AO SC for Trick (2hr) OSIRIS-N      
  Lyke E346OL: K1LGS/OSIRIS Characterization (8hr) OSIRIS-L      
  May 03a Stomski E335OL: AO SC for Trick (2hr) OSIRIS-N      
  Kwok E342LA: KCWI nod & shuffle (2hr) HIRES   s/w not ready  
  Apr 05a Panteleev Phasing (1.5hr) PCS      
  Kwok KCWI nod & shuffle (1.5hr) OSIRIS-N      
  Stomski AO SC for TRICK (2hr)      
  Feb 25 Panteleev K1 PCS post-upgrade tests (5.5hr) PCS      
  Kwok KCWI nod & shuffle (2hr)      
  Stomski AO SC for TRICK (2hr) OSIRIS-N      
  Feb 24 Panteleev Phasing (1.5hr) PCS      
    Panteleev K1 PCS post-upgrade tests (5.5hr)      
    Stomski AO SC for TRICK (2hr) OSIRIS-N      
  Feb 14 L. Cowie Science H292M MOSFIRE      
  Feb 13 Kassis MOSFIRE engineering MOSFIRE      
  Feb 12 Campbell/Lyke OSIRIS engineering OSIRIS-L      
  Stomski AO SC for TRICK (1hr)      
  Feb 07b Rizzi LRIS engineering LRIS      
  Jan 20 Panteleev Phasing (1.5hr) PCS      
  R. Campbell OSIRIS new grating checkout (9.5hr) OSIRIS-N      

2012

Date
Lead
PROJECT
Instrument
Plan
Status
Runtime Report
  Dec 03 TBD Give-Back Science TBD      
  Dec 02a TBD Give-Back Science HIRES      
  Dec 02b Panteleev Phasing (1.5hr) PCS      
  K1 SUFS (1.5hr)      
  R. Cohen ACS release (0.5hr)        
  Krasuski Pointing tests (2hr) SSC      
  Nov 27 Armandroff TK Science MOSFIRE       
  Nov 26 Kassis MOSFIRE engineering MOSFIRE      
  Nov 08b L. Rizzi Test IQM, measure POs (3hr) LRIS      
  S. Kwok KCWI nod & shuffle (2.5hr)      
  Oct 30 Wizinowich K1 LGS-AO Engineering OSIRIS-L      
  Oct 29 Panteleev Seg rewarp & Phasing PCS      
  K1 SUFS      
  Cohen ACSU test & release (1hr) contingency for ACSU    
  Sep 09 Kassis MOSFIRE engineering MOSFIRE      
  Cohen ACSU test & release (1hr) PCS release ACSU if ok on 9/4    
  Sep 04b Panteleev Seg rewarp & Phasing PCS      
  Cohen ACSU test (1hr)      
  Aug 02 Panteleev Seg rewarp & Phasing (2hr) PCS phasing only after rewarp    
  Wizinowich K1 LGS-AO Engineering OSIRIS-L      
  Jul 27 Panteleev Phasing PCS      
  Woillez, Ragland ASTRA/V2 Engineering ASTRA/V2      
  Jun 27 Kassis MOSFIRE commissiong MOSFIRE      
  Jun 26 Kassis MOSFIRE commissiong MOSFIRE      
  Jun 03 Kassis MOSFIRE commissiong MOSFIRE      
  Jun 02 Kassis MOSFIRE commissiong MOSFIRE      
  Jun 01 Kassis MOSFIRE commissiong MOSFIRE      
  May 10 Lyke OSIRIS K1 commissiong OSIRIS-L      
  May 09 Lyke OSIRIS K1 commissiong OSIRIS-L      
  May 06 Kassis MOSFIRE commissiong MOSFIRE      
  May 05 Kassis MOSFIRE commissiong MOSFIRE      
  May 04 Kassis MOSFIRE commissiong MOSFIRE      
  Apr 29 Panteleev Phasing PCS      
  Woillez, Ragland ASTRA/V2 Engineering ASTRA/V2      
  Apr 05 Kassis MOSFIRE commissiong MOSFIRE      
  Apr 04 Kassis MOSFIRE commissiong MOSFIRE      
  Apr 03 Lyke OSIRIS K1 commissiong OSIRIS      
  Apr 02 Lyke OSIRIS K1 commissiong OSIRIS      
  Mar 11 Lyke OSIRIS K1 commissiong OSIRIS      
  Mar 10 Panteleev Phasing PCS      
  Lyke OSIRIS K1 commissiong OSIRIS      
  Mar 03 TBD Give-Back Science HIRES contingent on successful MAGIQ commissioning    
  Mar 02 Lyke OSIRIS engineering OSIRIS-N      
  TBD Give-Back Science HIRESr contingent on successful MAGIQ commissioning    
  Mar 01 Dahm MAGIQ post-installation engineering HIRESr      
  Lyke OSIRIS engineering OSIRIS-N contingent on successful MAGIQ commissioning    
  Feb 15 Kassis LRIS engineering LRIS      
  Mader k1server upgrade software release; no sky time    
  Feb 11 Wizinowich K1 LGS, FST        
  Feb 09a TBD Give-Back Science HIRES      
  Feb 08a Panteleev Phasing PCS      
    Panteleev Phase-stacking crosstalk (1.25hr) PCS      
    Woillez ASTRA/V2 Engineering ASTRA/V2      

2011

Date
Lead
PROJECT
Instrument
Plan
Status
Runtime Report
  Proposals for 2011B Q2
  Jan 02 Panteleev Phasing PCS      
  Wizinowich K1 LGS, FST SHARC-L      
  Dec 31a Kassis LRIS engineering LRIS      
  Dec 13 Wizinowich K1 LGS, FST SHARC-L      
  Dec 11 Panteleev Phasing PCS      
  Wizinowich K1 LGS, FST SHARC-L      
  Nov 05a Ragland V2 SPR Engineering V2 SPR      
  Nov 04a Panteleev Phasing PCS      
  Ragland ASTRA/V2 Engineering ASTRA/V2      
  Proposals for 2011B Q1
  Oct 19 Wizinowich K1 LGS, FST SHARC-L      
  Oct 18 TBD Give-Back Science HIRES      
  Oct 17 TBD Give-Back Science HIRES      
  Oct 14a Engineering SegEx PCS      
  Oct 13 Engineering SegEx PCS      
  Oct 12 Engineering SegEx PCS      
  Oct 09 Ragland IF engineering ASTRA/V2      
  Sep 18 Wizinowich K1 LGS, FST SHARC-L      
  Sep 17 Kassis LRIS engineering LRIS      
  Sep 16 Engineering SegEx PCS      
  TBD Give-Back Science HIRES      
  Sep 15 Engineering SegEx PCS      
  Sep 14 Engineering SegEx PCS      
  Sep 10 Ragland IF engineering ASTRA/V2      
  Sep 09 TBD Give-Back Science HIRES      
  Sep 08 TBD Give-Back Science HIRES      
  Sep 07 Cohen ACS upgrade testing PCS      
  Panteleev T447 UFS of warped segments      
  Krasuski T1050 Open Loop Tracking SSC      
  Aug 12 Krasuski TCSU K2 pointing & compensation SSC      
  Aug 11a Engineering SegEx PCS      
  Aug 10 Engineering SegEx PCS      
  Aug 09 Engineering SegEx PCS      
  Proposals for 2011A Q2
  Jul 17   MOSFIRE commissioning MOSFIRE      
  Jul 16   MOSFIRE commissioning MOSFIRE      
  Jul 15 Panteleev K1 alignment and recovery PCS      
  E.Chock HIRES server upgrade HIRES most likely not needed; to be confirmed by 6/1    
  Jul 14   shutdown        
  Jul 13   shutdown        
  Jul 12   shutdown        
  Jun 23a   IF Engineering IF - Nuller      
  Jun 23b Ragland Single-disk K-band nulling IF - Nuller      
  Kwok Fix SSC guiding SSC      
  Jun 19   MOSFIRE commissioning MOSFIRE these nights are not quite settled yet. subject to change.    
  Jun 18   MOSFIRE commissioning MOSFIRE    
  Jun 17   MOSFIRE commissioning MOSFIRE    
  Jun 16a Engineering SegEx PCS    
  Jun 15 Engineering SegEx PCS    
  Jun 14 Engineering SegEx PCS    
  Jun 11 Ragland ASTRA engineering IF      
  IF Engineering IF - V2      
  May 26 Chin FST SHARC-L      
  May 20 Chin FST SHARC-L      
  May 19 Ragland ASTRA Engineering IF V2-DFPR      
  May 13 Kwok Fix SSC guiding SSC      
  Krasuski Pointing test SSC      
  Engineering SegEx PCS      
  May 12 Engineering SegEx PCS      
  May 11 Engineering SegEx PCS      
  Proposals for 2011A Q1
  Apr 24 Stalcup K1 FST and LGS commissiong SHARC-L      
  Apr 23 Ulander TCSU Upgrade HIRES      
  Dahm HIRES Spectral Atlas      
  L. Chock HIRESServer Upgrade      
  Apr 15a Panteleev Phasing (1.5hr) PCS      
  Engineering SegEx PCS      
  Apr 14 Engineering SegEx PCS      
  Apr 13 Engineering SegEx PCS      
  Apr 11 Stalcup K1 FST and LGS commissiong SHARC-L      
  Mar 21a IF IF engineering V2-Lband      
  Mar 19 Panteleev Phasing (1.5hr) PCS      
  Woillez ASTRA engineering IF      
  Mar 15 Stalcup K1 FST and LGS commissiong SHARC-L      
  Feb 15a Stalcup K1 FST SHARC      
  Feb 15b Vogt Give-Back Science HIRES      
  Feb 12a Panteleev Phasing (1.5hr) PCS      
  IF IF engineering Nuller      
  Proposals for 2010B Q2
  Jan 21 Woillez ASTRA DFPR IF      
  Panteleev Phasing (1.5hr) PCS      
  Jan 20a Woillez ASTRA        
  Jan 15   LRIS-R commissiong #3 LRIS contingency    
  Jan 14   LRIS-R commissiong #3 LRIS contingency    

2010

Date
Lead
PROJECT
Instrument
Plan
Status
Runtime Report
  Dec 22 Panteleev Phasing (1.5hr) PCS      
  Woillez ASTRA DFPR IF      
  Dec 16 Kassis LRIS-R commissiong #3 LRIS      
  Dec 15 Kassis LRIS-R commissiong #3 LRIS      
  Dec 02b Panteleev LRIS MAGIQ IQM LRIS      
  Dec 01a Dahm Exposure meter calibration HIRES      
  Nov 26 TBD Give-Back Science HIRES      
  Nov 25b Krasuski TCSU Azimuth Control Loop HIRES      
  Kwok SSC guiding SSC      
  Nov 23a Ragland V2-SPR IF      
  Nov 22 Panteleev Phasing (1.5hr) PCS      
  Woillez ASTRA DFPR IF      
  Nov 18 TBD Give-Back Science HIRES      
  Nov 17 TBD Give-Back Science HIRES      
  Proposals for 2010B Q1  
  Oct 29b TBD Give-Back Science HIRES      
  Oct 29a Panteleev Phasing (1.5hr) PCS      
  Engineering SegEx PCS      
  Oct 28 Engineering SegEx PCS      
  Oct 27 Engineering SegEx PCS      
  Oct 24a Tytler Give-Back Science HIRES      
  Oct 21b Krasuski TCSU Fine Acquisition & Azimuth tuning SSC      
  Oct 18a Woillez ASTRA DFPR IF      
  Oct 18b TBD Give-Back Science HIRES      
  Oct 17 R. Berstein Give-Back Science HIRES      
  Sep 17b Panteleev Phasing (1.5hr) PCS      
  Ragland Single dish K-band feasibility IF      
  Sep 14 Panteleev MAGIQ IQM LRIS      
  Proposals for 2010A Q2  
  Jul 20b Panteleev Phasing (1.5hr) PCS      
  Woillez V2 V2      
  Jul 19 Woillez ASTRA ASTRA      
  Ulander MOSFIRE local controls Modifications K1 Daytime test only, no skytime    
  May 29b Panteleev Phasing (1.5hr) PCS      
  Ragland L-band science mode characterization Nuller      
  May 07b Tran LRISp blue characterization LRISp      
  Panteleev MAGIQ IQM (2hr)      
  Proposals for 2010A Q1  
  Apr 30b TBD Give-Back Science TBD      
  Apr 28b T. Stalcup K1 LGS Engineering SHARC-L      
  Apr 23a Panteleev Phasing (1.5hr) PCS      
  Woillez ASTRA DFPR (4 hr) IF      
  Apr 22 T. Stalcup K1 LGS Engineering SHARC-L      
  Woillez ASTRA/Phasing IF      
  Apr 01 TBD Give-Back Science TBD      
  Mar 31 T. Stalcup K1 LGS Engineering SHARC-L      
  Kwok HIRES MAGIQ guider tests HIRES      
  Mar 30 Woillez ASTRA DFPR IF      
  Feb 27 T. Stalcup K1 LGS Engineering SHARC-L      
  Feb 24b Panteleev Phasing (1.5hr) PCS      
  Panteleev IQ and Throughput (0.25hr) SSC T1030    
  Dahm/Kwok HIRES Magiq guiding (2hr) HIRES      
  Woillez ASTRA T/T metrology (2hr) IF - K1      
  Proposals for 2009B Q2  
  Jan 31 T. Stalcup K1 LGS Engineering SHARC      
  Jan 28 T. Stalcup K1 LGS Engineering (5.5hr) SHARC K1 LGS first light! 1/2 night done nightlog
  Dahm HIRES MAGIQ engineering (4hr) HIRES   done
  S. Panteleev Pointing, and throughput tests (2hr)   T1030, 1038  
  Jan 23a S. Panteleev Phasing (1.5hr) PCS      
  T. Stalcup K1 NGS-AO Engineering SHARC      
  S. Panteleev Focus vs. Elevation (2hr) HIRES   done Jan 02 nightlog
  S. Dahm Iodine cell MAGIQ guiding (1hr)   done Jan 02 nightlog
  T. Krasuski Pointing tests   not done  
  Jan 22 S. Panteleev Focus vs. Elevation (2hr) LRIS      
  S. Panteleev LRIS IQM calibration (1hr)      
  M. Kassis LRIS Differential Flexure (8hr)      
  Jan 02 T. Stalcup K1 LGS Engineering SHARC   half night done nightlog

2009

Date
Lead
PROJECT
Instrument
Plan
Status
Runtime Report
  Dec 29 S. Panteleev Phasing (1.5hr) PCS      
  J. Woillez ASTRA DFPR IF      
  Dec 13a J. Woillez ASTRA DFPR (single dish) IF      
  Dec 04 TBD Give-Back Science TBD      
  Dec 03 TBD Give-Back Science TBD      
  Nov 23b S. Panteleev Phasing (1.5hr) PCS      
  R. Cohen PMFM vs. Elevation (2hr)      
  T. Krasuski High EL tracks (1hr)      
  R. Cohen Testing PMFM (1hr)      
  Nov 07a TBD Give-Back Science HIRES      
  Proposals for 2009B Q1  
  Oct 30 CIT Give-Back Science HIRESr      
  Oct 26b T. Stalcup K1 NGS Engineering SHARC      
  E. Chock SW release        
  Oct 24a IF Engineering IF Engineering Nuller      
  Oct 24b S. Panteleev Phasing (1.5hr) PCS      
  S. Panteleev Phasing LE baffles (1hr) PCS      
  S. Ragland Single-dish K-band nulling (2hr) IF      
  E. Chock SW release        
  Sep 27a M. Kassis Differential flexure LRIS   not done due to thick clouds nightlog
  E. Chock SW release        
  Aug 28 T. Stalcup K1 NGS Engineering SHARC   only ~1hr done, rest of night lost to weather  
  J. Woillez ASTRA DFPR IF   nightlog
  Aug 13b M. Kassis MAGIQ offset guider LRIS   done nightlog
  Aug 10b S. Panteleev Phasing (1.5hr) PCS   not much done due to technical problems nightlog
  T. Stalcup K1 NGS Engineering (3hr) SHARC  
               
Sat Apr 04a S. Panteleev Phasing (1.5hr) PCS   not done due to clouds nightlog
T. Stalcup K1 NGS 5x5 STRAP (1.5hr) SHARC   work hampered by clouds nightlog
T. Stalcup K1 NGS DAR testing (1hr) SHARC  
T. Stalcup K1 NGS launch tel alignment (1.5hr) SHARC  
Sat Mar 14 M. Kassis MAGIQ offset guider LRIS commissioning plan entire night lost to weather  
Thu Mar 12 M. Kassis MAGIQ offset guider LRIS commissioning plan postponed  
S. Panteleev Phasing (1.5hr) PCS   night wiped out by weather  
S. Kwok Pointing tests SSC    
T. Stalcup K1 NGS AO Engineering SHARC    
Wed Mar 11a T. Stalcup K1 NGS 20x20 STRAP (2hr) SHARC  

time lost to weather

 

 
T. Stalcup K1 NGS TSS field curvature (3hr) SHARC    
Sat Mar 07a S. Panteleev Phasing (1.5hr) PCS   night lost to weather  
T. Stalcup K1 NGS STRAP SHARC retry of Feb 10  
T. Stalcup K1 NGS AO Performance SHARC retry of Feb 10  
T. Krasuski TCSU tests PCS    
Sat Feb 14 M. Kassis MAGIQ slit guider LRIS commissioning plan done nightlog
L. Chock New DCS release (no sky time)        
Thu Feb 12 M. Kassis MAGIQ slit guider LRIS commissioning plan done nightlog
Tue Feb 10a K. Ulander Local controls PLC (no sky time)     entire night lost to weather  
S. Panteleev Phasing (1.5hr) PCS    
T. Stalcup K1 NGS STRAP (2hr) SHARC    
T. Stalcup K1 NGS AO Performance (2hr) SHARC    
Tue Feb 10b Boden Give-Back Science HIRES    
Tue Jan 13 M. Kassis LRIS Engineering LRIS      
Thu Jan 08b S. Panteleev

Phasing, IQ and Throughput (1.8hr)

PCS, SSC      
T. Krasuski Encoder & analog board tests (3.7hr)        
Wed Jan 07 Endl Give-Back Science HIRES      
Sat Jan 03 Fischer Give-Back Science HIRES      
Fri Jan 02 Butler Give-Back Science HIRES      
Thu Jan 01 Hillenbrand Give-Back Science HIRES      

2008

Date
Lead
PROJECT
Instrument
Plan
Status
Runtime Report
Tue Dec 16 K. Tsubota K1server upgrade (1hr)        
R. Matsuda K1 dome bogie repair        
Mon Dec 15 R. Matsuda

K1 dome bogie repair

       
Wed Dec 10b S. Panteleev

Phasing (1.5hr)

PCS, SSC Phasing to be done in IF 1st half night lost to weather  
Butler Give-Back Science HIRES  
Thu Nov 20 Djorgovski Give-Back Science HIRES      
Tue Nov 18 Smecker-Hane Give-Back Science HIRES      
Sat Nov 15b Jura Give-Back Science HIRES      
Sun Nov 09b S. Panteleev

Phasing, IQ and Throughput (1.8hr)

PCS, SSC   done  
T. Krasuski Encoder & analog board tests (3.7hr)     done nightlog
Sat Nov 08 TBD Give-Back Science HIRES      
Thu Aug 14b S. Panteleev Phasing PCS      
S. Ragland L-band Science Verification IF      
Thu Aug 07 TBD Give-Back Science HIRES      
Sun Jul 27 T. Krasuski Spare telescope controller cards HIRESr Pointing tests will not be done, as Heidenhain encoders won't be installed in time.    
TBD Give-Back Science      
Sun Jul 20 J. Woillez ASTRA SPR IF      
Sat Jul 19 Vogt Give-Back Science HIRESr      
Fri Jul 18 Butler Give-Back Science HIRESr      
Thu Jul 17 Simon Give-Back Science HIRESr      
Sat Jul 12b S. Panteleev Phasing PCS Phasing to be done during configuration change    
J. Woillez ASTRA SAT (2hr) IF    
J. Woillez ASTRA SPR (2.5hr)    
Fri Jun 27a M. Kassis MAGIQ (3hr) LRIS      
M. Kassis Slitmask improvement (1.5hr)      
Wed Jun 25 Fischer Give-Back Science HIRESr      
Tue Jun 24 S. Kwok MAGIQ HIRESr      
G. Hill HIRES Throughput      
Mon Jun 23 Marcy Give-Back Science HIRESr      
Tue May 27a T. Krasuski Pointing tests (1.5hr) LRIS   done nightlog
M. Kassis MAGIQ (3hr)   done nightlog
Fri May 23b S. Panteleev Phasing (1.5hr) PCS      
J. Woillez ASTRA SPR (3hr) IF      
Tue Apr 22b S. Ragland Validation of L-band mode (1hr) IF      
S. Kwok MAGIQ (4hr) HIRES     report
Sat Apr 12b S. Panteleev Phasing (1.5hr) PCS T962a    
Pott ASTRA angle tracking (1hr) IF      
J. Woillez ASTRA (2.5hr) IF      
Fri Mar 14b S. Panteleev Phasing (1.5hr) PCS T962a    
S. Panteleev Focus vs. elevation (2hr) HIRES T464    
S. Panteleev Focus vs. rotation (2hr) HIRES T980    
Mon Feb 18b Pott ASTRA angle tracking (1hr) IF   done report
J. Woillez ASTRA (4.5hr) IF   done  
Thu Feb 14b S. Panteleev Phasing (1.5hr) PCS T962a done  
S. Kwok MAGIQ and Pointing (4hr) HIRES   done nightlog
Tue Jan 22 Herczeg Give-Back Science HIRESr      
Mon Jan 21 Herczeg Give-Back Science HIRESr      
Sun Jan 20 G. Chanan Phasing + new PCS algorithm (11hr) PCS   done nightlog

2007

Date
Lead
PROJECT
Instrument
Plan
Status
Runtime Report
Sun Dec 30 Johnson Give-Back Science HIRES      
Sat Dec 29 S. Panteleev Phasing (1.5hr) PCS   done  
Laughlin Give-Back Science HIRES      
Mon Dec 03b S. Panteleev Instrument guider calibration (0.6hr) LRIS      
M. Kassis LRIS offset guider PO and image quality (5hr) LRIS   done nightlog
Mon Nov 26b S. Panteleev Phasing, IQ and throughput PCS/SSC   entire night lost to weather  
J. Woillez ASTRA (1.25hr) IF  

 

Old Schedules