Keck I Engineering Schedule

2006

Date
Lead
PROJECT
Instrument
Plan
Status
Runtime Report
Thu Dec 28 S. Panteleev MAGIQ Image Quality (2hr)

LRIS

     
A. Honey LRIS Rotator Tracking (3hr) LRIS   complete Nightlog
G. Wirth Pre-ADC Astrometric Calibration (2hr) LRIS   complete Nightlog
M. Kassis Pointing Origins and Throughput (3-4hr) LRIS   complete Nightlog

2007

Date
Lead
PROJECT
Instrument
Plan
Status
Runtime Report
Tue Jan 02 R. Matsuda Open Loop Tracking (1hr)

SSC

T1019 complete Nightlog
A. Honey Nasmyth Rotator Tracking (2hr) HIRES   complete Nightlog
S. Kwok Pointing Tests (1.5-4hr) SSC   complete Nightlog
S. Panteleev Segment Surface Quality (3hr) PCS T447 complete Nightlog
S. Panteleev Post-earthquake Warping Checkup (2hr) PCS T447 complete Nightlog
Thu Jan 04

Segment Exchange

Segment Exchange (5hr)

PCS

  weathered out Theses tasks have been rescheduled for contingency on Mar. 7.
S. Panteleev PCSP Performance (1.5hr) PCS T1017
S. Panteleev MAGIQ: Current Guider Limitation (2hr) HIRES  

S. Panteleev

Donut Method Calibration (2hr)

PCS, SSC

 
Fri Jan 05 Basri Give-Back Science HIRES      
  Jan 31 Segment Exchange Segment Exchange PCS Plan weathered out  
Thu Feb 01 Engineering NGWFC Engineering SHARC   weathered out  
Sat Feb 03 (2nd half) S. Panteleev Phasing (1.5hr) PCS T962 Partly done, hardware problems. Nightlog
S. Panteleev IQ and Throughput (0.5hr) SSC T984
S. Panteleev Windscreen Effectiveness (1hr) any T1011
S. Panteleev HIRES Focus vs. Elevation (2hr) HIRES T462
Tue Feb 06 Marcy Give-Back Science HIRES      
Wed Mar 07 S. Panteleev Engineering - Jan 4 programs PCS/SSC plan done T984, T962 Nightlog
S. Kwok Pointing tests SSC   complete
Thu Mar 29 (2nd half) S. Panteleev Phasing (1.5hr) PCS T962 done Nightlog
S. Panteleev IQ and Throughput(0.5hr) SSC T984 plan
S. Panteleev Windscreen Effectiveness (1hr) any T1011  
Sat Apr 28 S. Kwok

Tracking and pointing tests

SSC

  plan Nightlog
A. Honey Telescope Tracking LRIS-ADC  
Sun Apr 29 S. Panteleev Phasing; UFS, PCSP tests, IQ tests PCS/SSC T962a, T447, T984, T1017 plan Nightlog
S. Kwok Pointing tests SSC  
Tue

May 22a

G. Wirth

LRIS-ADC Engineering

LRISp-ADC

  complete KITN004
Thu May 31b S. Panteleev Phasing (1.5hr) PCS T962    
S. Panteleev Warping (1.5hr) PCS T447
S. Panteleev MAGIQ -secondary (1hr) PCS T1029
Wed Jun 20a G. Wirth

LRISp Engineering

LRISp

  weathered out  
Fri Jun 29b J. Woillez Angle Tracking Sensitivity (1hr) IF/MRI   weathered out Nightlog
S. Panteleev Phasing (1.5hr) PCS T962 done
S. Panteleev PCSP Performance (1.5hr) PCS T1017 weathered out
Tue Jul 03 S. Kwok

Possible pointing tests

HIRES

     
D. Fischer/P. Butler Give-Back Science
Thu Jul 19 S. Panteleev, S. Kwok Warping, Phasing, MAGIQ, Pointing tests PCS/SSC

Due to LRIS failure, some engineering intended for Aug. - Oct has been moved to this date.

most tests completed Nightlog
Thu Aug 02b Marcy Give-Back Science HIRES      
Mon Aug 20a Aug 20b G. Wirth LRISp Engineering LRISp      
Antonucci Give-Back Science LRISp      
Mon Aug 27b S. Panteleev, S. Kwok Phasing, IQ and throughput, SSC performance, pointing tests (5hr) PCS/SSC T962a, T1033, T1027, T920t    
Fri Sep 21 Huang Give-Back Science HIRES      
Wed Oct 20b J. Woillez ASTRA (1.25hr) IF   technical difficulty Nightlog
S. Panteleev Phasing, warping, IQ and throughput PCS/SSC T962a, T1033, T447    
Fri Oct 26b Boesgaard Give-Back Science HIRES      

 