EngNights Home | ETAC members| Policy | Proposing | KI Schedule | KII Schedule | Reports and Analysis



Keck I Engineering Schedule

Nov 03
Date
PI
PROJECT
Instrument
Proposal(s)
Plan
Runtime Report
Tue 4 Nov

S. Panteleev

K. Tsubota

T. Nordin

rewarp

DCS 4.1

Tracking

PCS

SSC

SSC

Image Quality

ver 4.1 test

open loop trk

  nightlog
Wed 5 Nov S. Panteleev

K. Tsubota

S. Panteleev

rewarp

DCS 4.1

Image Quality

PCS

SSC

SSC / HIRES

Image Quality

ver 4.1 test

Image Quality

  nightlog
Thu 6 Nov

M. Kassis

LWS + NIRC

LWS + NIRC

LWS shakedown   nightlog
Fri 14 Nov P. Wizinowich

Interferometer

DSM

    nightlog
Sat 15 Nov P. Wizinowich Interferometer DSM     nightlog
Sun 16 Nov P. Wizinowich Interferometer DSM     nightlog
Wed

19 Nov

P. Amico

S. Panteleev

LRIS

Image Quality

LRIS

Image Quality

  nightlog
Dec 03
Date
PI
PROJECT
Instrument
Proposal(s)
Plan
Runtime Report
               

Jan 04

Date
PI
PROJECT
Instrument
Proposal(s)
Plan
Runtime Report
Mon 5 Jan P. Wizinowich

Interferometer

DSM

    nightlog
Tue 6 Jan P. Wizinowich Interferometer DSM     nightlog
Wed 7 Jan P. Wizinowich Interferometer DSM     nightlog
Thu 8 Jan P. Wizinowich Interferometer DSM     nightlog
Tue 13 Jan TBD Science Give Back LRIS      
Wed 14 Jan TBD Science Give Back LRIS      
Thu 29 Jan

S. Panteleev

M. Kassis

Image Quality

Instrument eng

NIRC + LWS

Image Quality

 

  nightlog

Feb 04

Date
PI
PROJECT
Instrument
Proposal(s)
Plan
Runtime Report
Wed 4 Feb

 

 

H. Lewis

S. Paneleev

Science Give Back

Pointing

Telescope monitoring

HIRES (1/2 night)

Guider / SSC (1/2night)

SSC (0.5hrs)

Detector upgrade

 

segment monitor

  nightlog
Thur 5 Feb

 

H. Lewis

Science Give Back

Pointing

HIRES (1/2 night)

Guider / SSC (1/2night)

Detector upgrade

 

  nightlog
Mon 9 Feb   Science Give Back HIRES Detector upgrade    
Tue 10 Feb

P. Amico, S. Panteleev

E. Chock

LRIS reliability improvement

Guider S/W

LRIS

cont. focus

LRIS Plan

CF test plan

guider test #975

nightlog
Sun 29 Feb   Science Give Back HIRESr      

Mar 04

Date
PI
PROJECT
Instrument
Proposal(s)
Plan
Runtime Report
Wed 3 Mar P. Wizinowich Interferometer DSM (1/2 night)     nightlog
Thu 4 Mar P. Wizinowich Interferometer DSM     nightlog
Fri 5 Mar P. Wizinowich Interferometer DSM     nightlog
Mon 8 Mar P. Wizinowich Interferometer DSM (1/2 night)     nightlog
Tue 9 Mar P. Wizinowich Interferometer DSM (1/2 night)     nightlog
Wed 31 Mar 1st half

P. Wizinowich

Interferometer

DSM (1/2 night)

 

  nightlog
2nd half

S. Panteleev

E. Chock

focus experiment

guider SW

HIRES guider

HIRES guider

Secondary piston test

guider test

 

Apr 04

Date
PI
PROJECT
Instrument
Proposal(s)
Plan
Runtime Report
Thu 1 Apr P. Wizinowich

Interferometer

DSM

    nightlog
Fri 2 Apr P. Wizinowich Interferometer DSM     nightlog
Sat 3 Apr   Science Give Back HIRES (r or b)      
Sun 4 Apr P. Wizinowich Interferometer DSM     nightlog
Tue 6 Apr

S. Panteleev

S. Kwok

focus experiment

guider SW

HIRESb

guider

focus test plan   nightlog
Tue

27 Apr

S. Panteleev

 

M. Kassis

 

E. Chock

focus model calibration

LWS alignment / misc. testing

guider SW upgrade

f/25 + NIRC

LWS

f/25 guider

Focus Compensation Calibration

guider test

   
               

 

Old Schedules