EngNights Home | ETAC members| Policy | Proposing | KI Schedule | KII Schedule | Reports and Analysis


Keck I Engineering Schedule

Jul 2004

Date
PI
PROJECT
Instrument
Proposal(s)
Plan
Runtime Report
Thu 1 Jul P. Wizinowich

Interferometer

DSM

     

S. Panteleev

S. Kwok

B. Schaefer

El &Rot params, CF, Parfocality, ImQual

Pointing

Phasing

SSC , HIRES

SSC, HIRES

PCS

Optics

 

 

focus plan nightlog
Tue 13 Jul

P. Amico

S. Panteleev

LRIS

El &Rot params, CF, Parfocality

LRIS

LRIS

Optics

lris plan nightlog

Aug 2004

Date
PI
PROJECT
Instrument
Proposal(s)
Plan
Runtime Report
Sun 1 Aug M. Kassis F/25 chopping / focus LWS-NIRC Optics / LWS   nightlog
Fri 6 Aug P. Wizinowich

Interferometer

DSM

    nightlog
S. Kwok Cont. Focus Pointing SSC, Guider HIRES Optics  
Wed 18 Aug S. Vogt / G. Hill Detector Uprade HIRES     nightlog
Thu 19 Aug S. Vogt / G. Hill Detector Uprade HIRES     nightlog

Sep 2004

Date
PI
PROJECT
Instrument
Proposal(s)
Plan
Runtime Report
Wed 1 Sep P. Wizinowich

Interferometer

DSM

    nightlog
G. Hill HIRES Upgrade HIRES    

Oct 2004

Date
PI
PROJECT
Instrument
Proposal(s)
Plan
Runtime Report
Thu 26 Oct P. Wizinowich

Interferometer

DSM

    nightlog
G. Hill HIRES Upgrade HIRES    
Nov 2004
Date
PI
Project
Instrument
Proposal
Plan
Runtime Report
Thu 12 Nov F. Chaffee

Team Keck Science

LRISp

     
P. Amico engineering LRISp     nightlog
Dec 2004
Date
PI
Project
Instrument
Proposal
Plan
Runtime Report
Wed 1 Dec G. Hill

HIRES throughput

HIRES (SSC backup)

HIRES throughput    
J. Woillez OHANA OHANA    
Mon 20 Dec F. Chaffee

Team Keck Science

LWS

     
M. Kassis LWS-NIRC LWS-NIRC LWS eng  
Jan 2005
Date
PI
Project
Instrument
Proposal
Plan
Runtime Report
Wed 19 Jan P. Wizinowich

Interferometer

DSM

     
S. Kwok/ T. Nordin pointing/tracking SSC

Pointing

Tracking

 

 

Old Schedules