Change and Checkout Procedures

Changeouts

  1. Filters
  2. Gratings
  3. Slitmasks
  4. Installing the Polarimeter
  5. Removing the Polarimeter

Following reinstallation of LRIS at a new location or an LRIS power cycle, run from the instrument pulldown menu Engineering-> LRIS Power GUI -> All Power ON.

Last modified: 02/08/2010 19:20
Send questions or comments to:LRIS Support

The information on this page is the property of the W. M. Keck Observatory. The contents of this page or any part thereof shall not be copied or otherwise reproduced or transferred to other documents or used or disclosed to others for any purpose other than observing support at the W. M. Keck Observatory and the subsequent analysis and publication of scientific data obtained from observations conducted at the W. M. Keck Observatory. All rights reserved. © W. M. Keck Observatory.