SIAS Web Interface
SIAS Date: 2025-07-01Time of Printout: 17:10
 
Tue, 2025-Jul-01
STATUSK1K2
Telescopes
Keck 1 READY
Keck 2 READY
Scheduled
Instruments
MOSFIRE
(mosfire7)
READY
KPF-CC
(kpf1)
READY
NIRSPAO
(nspec6)
READY
NIRC2-LGS
(nirc4)
READY
Standby
Instruments
HIRESb
READY
OSIRIS
READY
NIRES
READY
Last Update Time: 2025-07-01 17:10 (HST)
SUPPORTK1K2
Observers[Guarneri, Hennawi, Schindler, Yang] [GBS, Rhem, Van Zandt][Liu, Walker] [Cronin, Echeverri, Finnerty, Horstman, Hsu, Inglis, Mawet, Ruffio, Sanghi, Sappey, Wang, Xin, Xuan, Zhang]
SALeo A.Greg D.
OARita M.
summit
Julie R.
summit
SWOCMatthew B.
Summit Support Contact Derek Petrowski Casandra Bishop
Who System Description Last Changed Job Done Comments
Initials Time
SupportLRIS**HIGH PRIORITY** Fill LN after arriving in the morning.
2025-07-01 12:45
DP 00:00Fill complete 
NAESIFill LN on arrival -- Cancelled
2025-06-01 08:41
   -- Cancelled 
SupportKCWI**HIGH PRIORITY** Fill BLUE Dewar LN *after* 9:30am
2025-07-01 12:58
CB 10:00Blue fill done, w/ LN2 detected in blue vent. Liquid valve closed.
Move away from fill position finished at 10:57 am HT. 
SupportNIRES**HIGH PRIORITY** Fill Main Tank LN on arrival
2025-07-01 13:13
CB 13:00Main tank filled. Main tank screw cap fully resecured, RBC2 rotator switch set back to "Enabled." 
SupportK2 FacilityFacility reset to LOCAL control.
2025-07-01 10:01
CB 09:30Dome exhaust, AAA, telescope, dome, and shutters all in Local. 
SupportK1LTAIInstall launch telescope cover
2025-07-01 12:45
CB/DP 12:45complete 
SupportK1 FacilityFacility reset to LOCAL control.
2025-07-01 12:46
DP 12:45complete 
SupportFacility CryoTransfer LN2 from partially full dewars to fill dewars
2025-07-01 14:23
CB 14:15 
SupportFacility CryoStage all empty dewars to the Keck 2 dome floor before Wednesday delivery.
2025-07-01 15:44
CB,DP 15:30Loc/Notes...
K1 = 3.25 on scope
K2 = Empty: 4 floor. Full: 2 floor, 2.75 total tel.
 
SupportKPFAfter 12:00pm confirm Red KPF dewar is at least 145 lbs on the K2 control touchscreen. Reset any timeouts
2025-03-10 10:56
DP 10:00Red Weight = KPF Warm Until Service Mission (Cancelled through the end of March -- Cancelled 
SupportDome TempsAfter 10:00 AM, Set both Dome temps to the MKWS forecasted 8:00 PM temperatures, found here: http://hokukea.soest.hawaii.edu/forecast/mko/ Please log temps in comments.
2025-07-01 13:24
DP 00:00Temperature set to 42.5 Degrees Fahrenheit 
SupportDEIMOSFill LN in afternoon.*CONFIRM SUCCESSFULL FILL COMPLETED AT DEIMOS INSTRUMENT PLC TOUCHSCREEN*
2025-07-01 14:52
CB 14:30Fill done, w/ LN2 detected in vent.
Liquid valve closed.
Fill line is connected w/ DEIMOS band brake engaged. 
SupportK1Reconfigure K1:
  • Move LRIS from CASS to RT2 and change ADC from In to Out;
  • Move MOSFIRE from RT1 to CASS;
  • 2025-07-01 12:03
    DP/CB 11:45Reconfiguration is complete. One hundred and forty added to the left spider. 40 added to the right spider for a total of 100. Balance check complete. Horizon Up; 0.5. Horizon Down;-1.0. Zenith up; 1.2. Zenith down;-0.5 
    SupportK1 FacilityNaz deck Tool Board and Binder checkout
    2025-07-01 12:47
    DP 12:45All tools accounted for 
    SupportK2 FacilityNaz deck Tool Board and Binder checkout
    2025-07-01 15:45
    CB 09:45No tools missing from board; nothing signed out.
    Same at 14:45 HT. 
    Laser TechK2LGSK2 Laser Checkout
    2025-07-01 14:29
    CB 14:15Laser propagated at 30, 60, and 90° el. Alignment ok, and beam visible on on beamtrain cameras. Temps ok. Laser halted and left in "READY" state.
    **Cal date extended - must calibrate tomorrow. JV to call summit. 
    SupportMOSFIREK1 Instrument & Guider READY
    2025-07-01 14:43
    DP 12:45guider check and test all complete 
    SupportKPF-CCK1 Instrument & Guider READY
    2025-07-01 14:44
    DP 12:45guider check and test all complete 
    SupportNIRSPAOK2 Instrument & Guider READY
    2025-07-01 14:30
    CB 14:30Testall and guider look good. 
    SupportNIRC2-LGSK2 Instrument & Guider READY
    2025-07-01 14:31
    CB 14:30Testall and guider look good. 
    SupportHIRESbK1 Standby Instrument READY
    2025-07-01 14:44
    DP 12:45guider check and test all complete 
    SupportOSIRISK1 Standby Instrument READY
    2025-07-01 15:03
    DP 12:45guider check and test all complete 
    SupportNIRESK2 Standby Instrument READY
    2025-07-01 14:22
    CB 13:30Testall and guiders look good. Rotator initialized, and released at -259.8 stationary. 
    SupportK1 TelescopeK1 Telescope READY
    2025-07-01 15:20
    DP 15:15Parked dark at Dome Flats 
    SupportK2 TelescopeK2 Telescope READY
    2025-07-01 14:49
    CB 14:45Telescope and dome released at Dome Flats, dome dark, tertiary at LNas. NIRC2 selected on TCS. 
    SupportLRISFill LN at or after 3:00pm
    2025-07-01 15:18
    DP 00:00FILL complete 
    SupportESIFill LN before departure -- Cancelled
    2025-06-01 08:41
       -- Cancelled 
    Last completed
    TBAD task:
    K1: 2025-06-26
    (5 days ago)
    K2: 2025-06-27
    (4 days ago)

    The server is: mysqlserver [readonly mode]

    The datebook is: datebook

    SIAS version 5.3.1