MIRLIN CRYO PROCEDURE
- Rotate MIRLIN from the stow positon to 2 o'clock.
This should be at ROTPPOSN = +43 degrees or thereabouts.
- LN2
- Remove LN2 vent cap from LN2 fill port. (no stinger installed)
- Prechill LN2 transfer line.
- Insert transfer line into LN2 fill port.
- Fill until LN2 splashes out.
- Remove transfer line.
- Install LN2 vent cap on LN2 port.
- LHe
- Remove LHe vent cap from LHe fill port. (no stinger installed)
- Prechill LHe transfer line until it plumes.
- Insert transfer line into LHe fill port.
- Fill for 1 minute:45 seconds only!
- Remove transfer line.
- Install LHe vent cap on LHe port.
- Rotate MIRLIN back to its stow positon (ROTPPOSN = -60 degrees).