Who | System | Description | Last Changed | Job Done | Comments |
Initials | Time |
OA | Vehicles | Please swap one of your vehicles with the summit emergency vehicle when coming down for the night. -- Cancelled | 2015-04-22 05:19
|   |   | -- Cancelled  |
Support | LRIS | **HIGH PRIORITY** Fill LN after arriving in the morning. | 2022-11-15 21:00
|   |   |   |
Support | KCWI | **HIGH PRIORITY** Fill RED Dewar LN *AFTER* 9:30am
*CONFIRM SUCCESSFULL FILL COMPLETED AT KCWI INSTRUMENT PLC TOUCHSCREEN*
"Red fill complete, LN2 detected in vent" | 2023-08-15 11:23
|   |   |   |
Support | | -- Cancelled | 2024-10-28 11:26
| Jlp  | 00:00 | -- Cancelled  |
Support | | -- Cancelled | 2024-10-28 11:26
| Jlp  | 11:30 | -- Cancelled  |
Support | ESI | Fill LN on arrival -- Cancelled | 2024-11-28 07:25
|   |   | -- Cancelled  |
Support | NIRES | **HIGH PRIORITY** Fill Main Tank LN on arrival | 2017-10-05 08:09
|   |   |   |
Support | K1 Facility | Naz deck Tool Board and Binder checkout | 2021-03-08 14:34
|   |   |   |
Support | K2 Facility | Naz deck Tool Board and Binder checkout | 2021-03-08 14:37
|   |   |   |
Support | K1 Facility | Facility reset to LOCAL control. | 2024-02-23 10:05
|   |   |   |
Support | K2 Facility | Facility reset to LOCAL control. | 2024-02-23 10:06
|   |   |   |
Support | K1LTAI | Install launch telescope cover | 2024-11-06 03:06
|   |   |   |
Support | K2LTAI | Install launch telescope cover | 2024-11-06 03:19
|   |   |   |
Support | KPF | By 10:00 am verify the 180l dewar in the basement is at least 1/3 full | 2024-01-23 15:28
|   |   |   |
Support | KPF | By 10:00 am verify the 180l dewar in the basement is at least 1/3 full | 2024-10-28 15:23
|   |   |   |
Support | KPF | After 12:00pm confirm Red KPF dewar is at least 145 lbs on the K2 control touchscreen. Reset any timeouts | 2024-11-18 10:17
|   |   | Red Weight =  |
Support | Dome Temps | After 10:00 AM, Set both Dome temps to the MKWS forecasted 8:00 PM temperatures, found here:
http://hokukea.soest.hawaii.edu/forecast/mko/
Please log temps in comments. | 2020-05-13 09:08
|   |   |   |
Support | Facility Cryo | Stage all empty dewars to the Keck 2 dome floor before Wednesday delivery. Take a count of all equivalent full dewars after delivery. | 2023-09-06 10:30
|   |   | Loc/Notes... K1 = K2 =   |
Support | HIRES | Fill 50LD with LN (before inst release if on sky)
| 2007-01-11 14:36
|   |   |   |
Support | LRIS | Fill 35LD with LN | 2011-01-27 10:40
|   |   |   |
Support | DEIMOS | Fill LN in afternoon.*CONFIRM SUCCESSFULL FILL COMPLETED AT DEOMOS INSTRUMENT PLC TOUCHSCREEN* | 2024-03-13 12:34
|   |   |   |
Support | K1 | Reconfigure K1: change OBaffles from Retracted to Deployed; | 2024-11-06 03:06
|   |   |   |
Support | K1 Facility | Naz deck Tool Board and Binder checkout | 2021-03-08 14:33
|   |   |   |
Support | K2 Facility | Naz deck Tool Board and Binder checkout | 2021-03-08 14:35
|   |   |   |
Support | KPF | K1 Instrument & Guider NOT READY | 2024-06-04 03:12
|   |   |   |
Support | NIRC2-NGS | K2 Instrument & Guider NOT READY | 2024-06-04 03:26
|   |   |   |
Support | LRIS-ADC | K1 Standby Instrument NOT READY | 2024-06-04 03:12
|   |   |   |
Support | OSIRIS | K1 Standby Instrument NOT READY | 2024-06-04 03:12
|   |   |   |
Support | HIRESb | K1 Standby Instrument NOT READY | 2024-12-07 03:02
|   |   |   |
Support | NIRES | K2 Standby Instrument NOT READY | 2024-06-04 03:26
|   |   |   |
Support | K1 | K1 Telescope NOT READY | 2007-04-30 17:43
|   |   |   |
Support | K2 | K2 Telescope NOT READY | 2007-01-11 14:31
|   |   |   |
Support | KPF | At around 2:30 pm, make sure the dewar in the basement has enough for tomorrows fill or at least 1/3 full | 2024-02-29 13:08
|   |   |   |
Support | LRIS | Fill LN after telescope initialization | 2018-03-06 16:31
|   |   |   |
Support | ESI | Fill LN after telescope initialization -- Cancelled | 2024-11-28 07:26
|   |   | -- Cancelled  |