NIRC Installation and Removal
The NIRC is installed in the IR Forward Cass Module by lowering
it vertically using a special Installation Fixture. The crane
should have a precision handling device such as a Hydroset. The
the installation fixture is designed to protect the dewar from
hitting the module or any other instrument properly positioned
in the module. The dewar is attached with two captive socket head
bolts to a special mounting plate that reproducibly aligns the
dewar in the module. It is assumed that the dewar starts in its
handling fixture and that the dewar mounting plate is already
attached to the module mounting surface.
NIRC Installation
- Disconnect all cables and cap open sockets.
- Remove all pumping fittings and cap the vacuum ports.
- Check that Tertiary Mirror Module is properly attached with
its lid shut.
- Rotate dewar to the horizontal with window down and electronics
boxes up.
- Prepare crane with precision handling device (Hydroset).
- Hook Installation Fixture by its adjustable wire sling to
precision lifting device on crane.
- Adjust sling so that the end of the Installation Fixture with
the movable ears is about 10 inches above the end with the cross
bolt.
- Check that the attachment pin is out of the center boss and
in the 1/2 inch hole in the top of the fixture.
- Position the fixture above the dewar with the ears around
the window end and the cross pin of the fixture just in front
of the dewar hook by the electronics boxes. The pin is released
by holding the pin shoulder between the index and middle fingers
and pushing in the button on the end with the thumb. This retracts
the ball on the other end allowing the pin to be extracted.
- Watching for the socket caps, slide the cross bolt into the
hook on the dewar.
- While keeping the bolt in the hook, lower the fixture with
the crane until the boss in the middle bottom of the fixture goes
around the mating boss on the dewar.
- Insert the pin through the hole in the two bosses to lock
them together. The button on the end of the pin must be depressed
to insert it in the hole.
- If the Handling Fixture is to be moved with the dewar, leave
the two pins that lock the ears on the dewar to the Handling Fixture
in place to keep the fixture locked to the dewar so both can be
picked up by the crane; if not, remove the gear shield on the
Handling Fixture by loosing the four screws and sliding it up
and off, and also remove the two pins in the fixture.
- Adjust the sling by sliding the eye to the position that will
keep the dewar horizontal. This can be done by lifting slightly
with the handling device on the crane and seeing which end tries
to sink and then slacking off and moving the eye slightly to that
end of the sling wire and trying again. WARNING:
Do not shock the dewar when lowering it into the fixture.
- The dewar can now be hoisted by the crane.
- Remove the two handling fixture ears from the dewar, the one
with the gear and the one with the bearing sleeve. Each is held
with 4 captive socket head screws that require a 1/4 inch hex
wrench.
- Attach the ears to the handling fixture with the pins and
replace the gear cover.
- Remove the Handling Fixture from the dewar if it is attached
(See above).
- Check that the dewar mounting plate it properly attached to
the module.
- Rotate the Forward Cass IR Module so that the bay to receive
the dewar is straight up.
- If the 4 knurled screws on the Installation Fixture cross
bars have been previously properly set and locked, leave them
as is, otherwise fully extend them downward.
- Fully contract the adjusting fixture mounted to the crane.
- Position the dewar above the module so that it is properly
positioned over the bay.
- Using the adjusting fixture on the crane lower the dewar so
that the mounting end, the ears and the bar at the window end
of the dewar are all captive in the bay.
- Connect any hoses and cables that must be connected before
the dewar is fully installed. DO NOT connect any
level shifter or preamplifier electronics cables. The dewar is
not necessarily well grounded.
- Using the slowest crane motion, lower the dewar until it is
within the range of the adjusting fixture attached to the crane
of being seated. If the range is small the adjusting fixture should
be contracted when the dewar is part way down.
- Use the adjusting fixture on the crane to lower the dewar
until the mounting plate and dewar are engaged. NOTE: If the 4
knurled screws were previously properly adjusted and locked, the
dewar will be full engaged with the mounting plate and resting
on the two knurled screw head near the window of the dewar. The
two other screw heads near the mounting end of the dewar should
be tight against the uprights of the frame. The intent is that
when the dewar mounting bolts are tightened, the window end of
the dewar should rise slightly, about .1 inch, so that the installation
fixture is free enough that the pin holding it to the dewar can
be extracted by pressing down on the end of the fixture opposite
the hook. The bars are springs to take up shock of lowering into
the bay and to prevent the dewar from intruding into another instrument's
space.
- If the knurled screws have not been adjusted then back them
off bit by by bit as the dewar is being lowered.
- When the dewar is in the proper position slack off on the
fixture several inches with the crane.
- Turn off the crane. WARNING: When the mounting
bolts are engaged the crane can do serious damage to the instrument
and module.
- Tighten both spring loaded captive 1/2 inch mounting socket
head bolts to 200 to 500 in/lbs of torque with a 3/8 hex wrench.
- Remove attachment pin from center boss on Installation Fixture
and put it in the hole on the top of the fixture. The pin is released
by holding in the center button on its end. It might be necessary
to put a downward force on the window end of the fixture to free
the pin.
- Turn on the crane.
- Lift the fixture so that the pin end can be disengaged from
the hook on the dewar. Watch out for the sockets on the electronics
boxes and also for the extending ears on the fixture.
- Hoist the fixture clear and store the fixture and sling.
- Connect all remaining cables and hoses, and fasten them properly
so that they cannot hang up when the module is installed or rotated
in the telescope.
NIRC Removal
- Turn off all electrical power to the dewar, electronics, motors,
and heaters.
- Unplug and clear all accessible cables and hoses to the dewar.
- Cap all accessible sockets on the dewar.
- Rotate the IR module so that the bay with the dewar is straight
up.
- Prepare crane with precision handling device (Hydroset) in
its fully contracted position. Hook Installation Fixture by its
adjustable wire sling to precision handling device on crane.
- Adjust sling so that the end of the Installation Fixture with
the movable ears is about 10 inches above the end with the cross
bolt.
- Check that the attachment pin is out of the center boss and
in the 1/2 inch hole in the top of the fixture.
- Position the fixture above the dewar with the ears around
the window end and the cross pin of the fixture just in front
of the dewar hook by the electronics boxes. The pin is released
by holding the pin shoulder between the index and middle fingers
and pushing in the button on the end with the thumb. This retracts
the ball on the other end allowing the pin to be extracted.
- Watching for the socket caps slide, the cross bolt into the
hook on the dewar.
- While keeping the bolt in the hook, lower the fixture with
the crane until the boss in the middle bottom of the fixture goes
around the mating boss on the dewar. This might take force on
the window end of fixture to bend the crossarms that push on the
module posts so that the pin can be pushed into the boss.
- Turn off the crane. WARNING: When the attachment pin is in
the boss, the crane can do damage to the dewar and the module
if it is raised.
- Insert the pin through the hole in the two bosses to lock
them together. The button on the end of the pin must be depressed
to insert it in the hole. Check that the adjusting screw heads
are firmly against the module posts. WARNING: These
screws stop the module from intruding on the other instrument
spaces when the mounting bolts are loosened.
- Loosen both spring loaded captive 1/2 inch socket head mounting
bolts that with a 3/8 hex wrench. Make sure that they both are
disengaged!
- Turn on the crane.
- Again make sure both mounting bolts are disengaged from the
mounting plate.
- Set the precession adjusting fixture on the crane to its fully
extended position.
- Move the eye on the adjustable sling to the nominal position
on the cable for lifting the dewar horizontally.
- Take up all but a little of the slack in the sling with the
slow motion of the crane.
- Lift the dewar slightly with the precession adjusting fixture.
- Check to see that it is free and balanced horizontally.
- If it is not horizontal, lower the dewar with the adjusting
fixture and move the eye on the sling toward the low end of the
dewar and then try again.
- When the dewar is horizontal and free lift it only high enough
to disconnect the remaining hoses. The ears and end bar of the
Installation Fixture and the dewar should still be captive in
the frame.
- With the dewar now completely detached from the module, lift
it using the slow of the crane till it is completely free of the
module.
- Position the dewar over the Handling Fixture.
- Remove the gear cover from the handling fixture by loosing
the 4 knurled screws and sliding the cover up and off.
- Remove the pin that holds the gear attachment to the Handling
Fixture post and let it hang by the chain.
- Screw the gear to the boss on the side of the dewar using
a 1/4 inch hex wrench to tighten the 4 captive screws.
- Do the same with the sleeved bearing on the other side of
the Handling fixture.
- Contract the precession lifting device on the crane.
- Lower the dewar with the slow motion of the crane until it
is to within about 3/4 inch of being seated in the Handling Fixture
posts.
- Use the precession lifting device to lower the dewar the rest
of the way into the Handling Fixture. Check to see that the gear
engages with the worm as the dewar is lowered.
- Insert both pins in the hole in the posts and reinstall the
gear cover.
- The dewar and Handling Fixture can now be moved with the crane
if desired. If this is done use the precession lifting device
to finally place the load back on the ground to eliminate shock
to the dewar.
- To remove the Installation Fixture, remove the attaching pin
in the central boss of the fixture.
- Lift the Installation fixture with the slow motion to the
crane until the window end is about 10 inches higher than the
other end.
- Slide the cross bolt of the fixture out of the hook on the
dewar, taking care not to damage the electrical sockets.
- Lift the fixture clear with the crane.
- Detach the Installation Fixture with the sling from the crane
and store.