Final test plan
Sunday, July 6, 2003.
5:00: AO system calibration (David)
6:00: Verify new release of OBS with FCS and WPS tracking shaper fix. (Scott)
Twilight test with some additional testing during Kelle’s tests below.
7:30: Auto-acquisition tests (Kellee)
2 hours dedicated time plus additional tests in parallel with WFC tests below.
9:30 IDL procedure testing (David)
10:00 Verify newest release of K1 AO WFC (Erik, David)
1) File I/O (new SNL based File loads) (1/2 hour)
2) Test Wavefront Sensor Focus Offloading work around (1 hour)
3) Test new release of PRC with the following new features: (1/2 hour)
a. Keyword interface between PRC and WFC
b. Socket interface between PRC and WFC
4) Test IDL reconstructor widget using socket interface (1/2 hour)
12:30 Characterize the severity of the WFC Telemetry stalls that are responsible for the focus offloading problem. (Erik, David)
1:00 Look for tip/tilt offloading problems that could also be related to telemetry stalls. (Erik, David)
1:30 Performance tests (Erik, David)
Take open / closed loop diagnostics to support computing disturbance rejection curves. Perform tests on both bright and dim stars.
3:00 Pointing tests (Wayne)