LGS-AO Engineering
6 Aug 2003 HST (2nd half)
Note: there is no laser propagation planned for tonight
- tip/tilt "error_10" testing (testing for AO operations), 1 hr
per DLM/EJ
- STRAP magnitude limits and parameter testing, 3.5 hr per EJ
- LBWFS testing, in parallel to other tests, per DLM/SH
- LBWFS plate scale test (if time permits), 0.5 hr per AC