Keck II
Engineering Plan

Date: Friday, 14 July 2003
Configuration: f/15 + tertiary
K2AO + DSM (1st half)

SSC

K2AO + NIRC2

Test Description (Remedy "T" number)

Instrument (system)

Duration (hrs)
PI
Interferometer DSM 4.5 P. Wizinowich

Pointing Test T920 D

SSC 2.5 W. Dahl
NIRC2 AO PR Targets NIRC2 1.5 D. LeMignant / R. Campbell