Keck II
Engineering Plan

Date: Friday, 11 July 2003
Configuration: f/15 + tertiary
K2AO + NIRC2

PCS

Note: No laser propagation

Test Description (Remedy "T" number)

Instrument (system)

Duration (hrs)
PI
Auto Acquisition ACAM 1.0 K. Summers

WFC release testing

(EPICS-based, not on "GLACK")
(some auto acq. in parallel)

WFC 2.0 E. Johansson, D. LeMignant
STRAP parameters testing STRAP 1.5 E. Johansson, D. LeMignant
STRAP mag limits STRAP 0.5 E. Johansson
LBWFS image processing components (concurrent with STRAP) LBWFS   E. Johansson
LBWFS plate scale LBWFS 0.5 A. Contos
Pointing Test, T920 D SSC 2.5 W. Dahl
PCS Phasing Test, T 962 A PCS 1.5 P. Wizinowich
PCS Phasing Test, T 962 B PCS 0.5 P. Wizinowich