Keck I Pointing Test
6 July 2003
We have a pointing test planned for the last half of Sunday night. There might be more (or less) time available than originally planned.
If there is 3+ hours available, run t920b.
If there are less than 3 hours, run a similar test but with less stars. The command is
tpstar -dcs2 -azs 330 -azn 90 -azd 4 -els 85 -eln 6 -eld -13.0 -rad 0.5
This is 90 stars instead of 120 which should reduce the test time.
And, if there is still time remaining, a PRM run. I'll be in that afternoon
to do one and I'd like to see if there are any changes. But that's lowest priority.