Keck II Engineering Schedule

2006

Date
Lead
PROJECT
Instrument
Plan
Status
Runtime Report
Fri Dec 29 S. Panteleev NIRSPEC Parfocality (2hr) NIRSPEC T995 complete Nightlog
R. Matsuda Open Loop Tracking (1hr) SSC T1019 complete Nightlog
A. Honey Nasmyth Rotator Tracking (3hr) NIRSPEC   complete Nightlog
S. Panteleev PCSP Performance and Post-earthquake Checkup (2.5hr) PCS T1017, T447 complete Nightlog
S. Panteleev Monthly Telescope Phasing (2hr) PCS T962 complete Nightlog

2007

Date
Lead
PROJECT
Instrument
Plan
Status
Runtime Report
Wed Jan 24 Lyke/Campbell OSIRIS Post-earthquake Recovery Tests

OSIRIS

  complete Nightlog
M. van Dam AO Engineering OSIRIS/NIRC2   STRAP failure; only partially done Nightlog
Thu Feb 01 Ofek Give-Back Science

NIRSPEC

     
Fri Feb 02 Moskovitz/Stalder Give-Back Science NIRSPEC/NIRC2      
Sat Feb 03 (2nd half) S. Panteleev Phasing (1.5hr) PCS T962 Partly done; hardware problems Nightlog
S. Panteleev IQ and Throughput (0.5hr) SSC T984
S. Panteleev MAGIQ Image Quality (2hr) NIRSPEC  
S. Panteleev MAGIQ focus (2hr) NIRSPEC T503
Tue Feb 06 Mumma Give-Back Science NIRSPEC      
Wed Feb 07 Hillenbrand Give-Back Science NIRSPEC      
Wed Feb 28 Moskovitz Give-Back Science (half night) NIRSPEC      
S. Kwok MAGIQ Acquisition Test (2hr) NIRSPEC   Mostly done; some weather issue Nightlog
S. Kwok Pointing Test (4hr) SSC T920
Thu Mar 01 S. Panteleev Phasing (1.5hr) PCS T962 Mostly completed; lost some time to hardward problems Nightlog
S. Panteleev IQ and Throughput (0.5hr) SSC T984
S. Panteleev MAGIQ (2hr) NIRSPEC  
S. Panteleev Super UFS (4hr) PCS  
Sat Mar 03

Cordova

Give-Back Science

NIRSPEC

     
Sun Mar 04 Cordova Give-Back Science NIRSPEC      
Thu Mar 08 G. Wirth ESI Engineering ESI      
A. Honey ESI Rotator Tracking ESI      
Thu Mar 29 (2nd half) S. Panteleev Phasing (1.5hr) PCS T962    
S. Panteleev IQ and Throughput (0.5hr) SSC T984 plan  
S. Panteleev Super UFS (2hr) PCS      
S. Kwok

MAGIQ Acquisition Test (2hr)

NIRSPEC

     
Thu May 31b S. Panteleev Phasing (1.5hr) PCS T962    
S. Panteleev MAGIQ Donut Calib (3hr) PCS T1026
Mon Jun 25 M. Rich/McLean Give-Back Science NIRSPEC      
Tue Jun 26 S. Kwok MAGIQ Acquisition (2hr) NIRSPEC Note that the dome will be fixed at azimuth 190. done Nightlog
Thu Jun 28 S. Panteleev

SSC Performance (1hr)

SSC

T1027/1028 weathered out Nightlog
S. Panteleev Super UFS (2hr) PCS  
S. Panteleev MAGIQ -secondary (1hr) PCS T1029
S. Panteleev MAGIQ Donut Calib (4hr) PCS T1026
Fri Jun 29b J. Woillez Angle Tracking Sensitivity (1hr) IF/MRI   weathered out Nightlog
S. Panteleev

Phasing (1.5hr)

PCS

T962 done
S. Kwok Pointing tests (2hr) SSC   weathered out
Sat Jul 28 S. Panteleev Super UFS (2hr) PCS   not complete Nightlog
S. Kwok MAGIQ Acquisition (2hr) NIRSPEC   done
A. Conrad NIRC2 Distortion (5hr) NIRC2   done
Thu Aug 02b S. Panteleev Phasing, IQ and throughput, SSC performance (2.75hr) PCS/SSC T962a, T1033, T1027 plan fogged out
S. Kwok MAGIQ acquisition (2hr) NIRSPEC   some closed dome tests
Thu Aug 27b S. Panteleev Phasing, IQ and throughput, super UFS, UFS for K2 ref seg (4.75hr) PCS/SSC T962a, T1033    
Fri Aug 31 S. Panteleev MAGIQ donut, plate scale (2hr) PCS T1031, T848    
S. Kwok MAGIQ GUI (2hr) NIRSPEC      
J. Lyke NIRSPEC pointing origin (0.5hr) NIRSPEC      
M. van Dam NGS-AO (5.5hr) NIRC2      
Thu Sep 27 S. Kwok MAGIQ engineering; pointing tests NIRSPEC      
Fri Oct 19 S. Kwok MAGIQ guiding and monitor (0.5hr) NIRSPEC SK to check out guiding for ~0.5hr then continue to monitor while night is given to science obs.    
Urbaneja Give-Back Science NIRSPEC      
Sat Oct 20b J. Woillez ASTRA (1.25hr) IF   technical difficulty Nightlog
S. Panteleev Phasing, IQ and throughput, super UFS (3.75hr) PCS/SSC T962a, T1033    

 