I’m sure I am doing this at a time
that is out of the regular sequence, but I’m new here and still learning the
ropes. Anyhow, I’m interested in obtaining some engineering time in Keck
1. Below are the items of interest to the
E-TAC.
- Personnel:
- Principal
Investigator – Klaus Ulander
- Electronic Tech –
Gary Anderson
- Optional – Tomas
Krasuski
- Purpose of Test:
General Telescope Engineering
- Test
Number:
- ECR-91254
- ECR-91264
- Test Duration: 4
hours
- Description of
Test: I will be making changes to the Local Controls PLC for Keck
1. The two changes to be made are (1) ECR-91254 a modification to the
baffle controls and logic to allow for a third operating mode without manually
overriding the baffles; and (2) ECR- 91264 adding a network module to the PLC
to allow remote troubleshooting. The changes will involve reconfiguring
the K1 Local Controls PLC. Functional testing will consist of ensuring
the baffles operate in all three desired modes, and ensuring network
connectivity of the Local Controls PLC. An interlock check will be
required following the functional testing to verify all safety interlocks
associated with the Local Controls PLC operate correctly. I intend to
make the modifications and test during the day, and use the engineering time
in the early evening as a buffer for delays in the event I find we need to
revert to the original configuration. Chances are very good that the
engineering time can be doubled up with another project in parallel as I
expect testing to be completed during the day and general telescope use will
further bolster the functionality of the system.
- Telescope/Instrument
configuration required: The changes require the PLC to be powered down for
reconfiguration and then powered up and reprogrammed. The telescope will
not be able to move while reconfiguring. Following reconfiguration the
telescope will be moving in Az and El. Any Instrument can be
installed.
- Plan for Data
Reduction, Analysis, and Reporting: The tests are simple in nature, and
a checklist to ensure operational status will be produced. An interlock
check will be performed and filed in the standard manner. A simple
pass/fail summary will be sufficient.
- Preferred Dates of
Observations: Given the restrictions to telescope activities this would
be a good candidate for a Sunday daytime changeover and evening test. As
mentioned previously, another test can be doubled up with this one. As
far as dates are concerned, Late February through March should be avoided as
my wife and I are expecting the arrival of our second around that
time.
Let me know if you require further
information.
Thanks for your
help,
Klaus
~~~~~~~~~~~~~~~~~~~~~~