From: Marcos van Dam Sent: Tuesday, July 10, 2007 1:54 PM To: Hien Tran Subject: Re: Engineering time requests Follow Up Flag: Follow up Due By: Thursday, July 12, 2007 12:00 AM Flag Status: Flagged Hi Hien, We would like to request the August 27 half night for NGS AO engineering in support of advanced NGWFC functionality and upgrades to the AO operations software. The tests that we would like to do during that time are: Centroid gain estimation Control loop optimization Advanced control law testing Archiver/autoretrieval of parameters Plate scale testing DTCLP testing PSF/Strehl as a function of wavelength Find STRAP focus Determine the reason for the LBWFS focus shift This request assumes that October 18 is also an NGS AO engineering night and that Nov 1 is an LGS AO engineering half night. Thanks a lot! Marcos