LWS Upgrade Project News

updated 01 June 98

  •  First cold tests (27May - 31May) of the engineering grade chip were successful!
  • One dead channel on engineering array.
    Sensitive for all filters, sensitivity not yet quantified.
    Problem discovered: system/detector noise being higher than backgound noise.
    Stray radiation in dewar detected, limiting ability to test and quantify system characteristics
    Temperature control of detector worked very well in range 6 to 11 deg K
  • Second Cold Test scheduled for 7 -12 June 98
  • Science grade detector due 1 July 98, installation and testing to follow.
  • Project review and summit commissioning anticipated for late summer 98

  •  
     

    LWS Image of Test Aperture at 11.7 microns, 30May98