powerdownor
powerdown deiccdTo power down the DEIMOS FCS CCD controller, use:
powerdown deifcsThe script will ask you to confirm that you REALLY want to power down the DEIMOS science (deiccd) CCD controller. Answer either yes or YES and then hit the RETURN key.
This command should, after a delay of about 40 seconds, cause the analog switches in the dewar electronics to open up (thus electrically isolating the CCD mosaic inside the dewar from the outside world) and then cause analog power (+35 volts, +16 volts, and -16 volts) to be removed from the backplane of the DEIMOS science CCD controller.
This command takes about 1 minute to complete. When it is done, it will either confirm that the analog power down sequence was successful, or it will tell you why it was not. If the powerdown command did not succeed, then contact the DEIMOS instrument team in Santa Cruz for troubleshooting assistance.
**** WARNING ****
CYCLING POWER ON THE CCD CONTROLLER WILL INJECT CHARGE INTO THE CCDS.
THIS INJECTED CHARGE WILL TAKE 10 TO 20 HOURS TO DECAY AFTER POWER ON.
YOU SHOULD AVOID POWERING DOWN THE CONTROLLER IF YOU ARE PLANNING TO
OBSERVE WITH THIS CCD WITHIN THE NEXT 24 HOURS.
ARE YOU SURE YOU WANT TO CONTINUE WITH THIS POWER DOWN SEQUENCE? (yes/no)
yes
Will proceed with power down sequence in 10 seconds
Waiting 60 seconds for power down sequence to complete
The CCD controller for service deiccd has been powered down
It is now safe to turn off the main power switch on the front panel
of the DEIMOS science CCD controller power supply chassis that is
located in bay 8 of the DEIMOS electronics ring
**** WARNING ****
CYCLING POWER ON THE CCD CONTROLLER WILL INJECT CHARGE INTO THE CCDS.
THIS INJECTED CHARGE WILL TAKE 10 TO 20 HOURS TO DECAY AFTER POWER ON.
YOU SHOULD AVOID POWERING DOWN THE CONTROLLER IF YOU ARE PLANNING TO
OBSERVE WITH THIS CCD WITHIN THE NEXT 24 HOURS.
ARE YOU SURE YOU WANT TO CONTINUE WITH THIS POWER DOWN SEQUENCE? (yes/no)
yes
Will proceed with power down sequence in 10 seconds
Powering down DEIMOS CCD controller service deifcs
Waiting 60 seconds for power down sequence to complete
The CCD controller for service deifcs has been powered down
It is now safe to turn off the main power switch on the front panel
of the DEIMOS FCS CCD controller chassis that is located
in bay 10 of the DEIMOS electronics ring
If the powerdown sequence is not successful, the following
message will be shown in the terminal:
Waiting 60 seconds for power down sequence to complete
The +35 volt analog power for this controller did not turn off
The +/- 15 volt analog power for this controller did not turn off
The analog switches in the dewar did not open as commanded
*** The power down sequence for DEIMOS CCD controller service deifcs
*** was not successful. Please call UCO/Lick at UC Santa Cruz
To power down the FCS CCD in an orderly manner when the
command powerdown deifcs fails, modify the following
keywords:
modify -s deifcs utbn2fil=off
modify -s deifcs utb30ven=disabled
modify -s deifcs utb15ven=disabled
modify -s deifcs utbn2htr=off
You can check that the system was powered down correctly by
running again the commabnd powerdown deifcs. The
output should be as follows:
The CCD controller for service deifcs has already been powered down