| OCTOBER 1996 | ||||||||||
| Keck 2 Semester 96B | ||||||||||
| Day | Date | % Dark | Observer (s) | LOC | Instr. | Institution | OA | IS | Code | PI |
| T | 1 | 28 | Armus | LRIS | CIT | WW | C63L | Armus | ||
| W | 2 | 36 | Guhathakurta,Reitzel,Shambrook | LRIS | UCSC | WW/CS | U86L | Guhathakurta | ||
| Th | 3 | 44 | Guhathakurta,Reitzel,Shambrook | LRIS | UCSC | WW/CS | U86L | Guhathakurta | ||
| F | 4 | 52 | M Cohen, Ogle | LRISp | CIT | CS | C64L | M Cohen | ||
| Sa | 5 | 60 | M Cohen, Ogle | LRIS | CIT | CS | C64L | M Cohen | ||
| Su | 6 | 67 | Oke | LRIS | CIT | TS/CS | C65L | Oke | ||
| M | 7 | 75 | Steidel | LRIS | CIT | TS | C66L | Steidel | ||
| T | 8 | 83 | Steidel | LRIS | CIT | TS | C66L | Steidel | ||
| W | 9 | 91 | Steidel | LRIS | CIT | TS | C66L | Steidel | ||
| Th | 10 | 99 | Filippenko | LRIS | UCB | TS/WW | U87L | Filippenko | ||
| F | 11 | 100 | Filippenko | LRIS | UCB | WW | U87L | Filippenko | ||
| Sa | 12 | 100 | Stockton | LRIS | UH | WW | H21L | Stockton | ||
| Su | 13 | 95 | Stockton | LRIS | UH | WW | H21L | Stockton | ||
| M | 14 | 87 | J Cohen | LRIS | CIT | WW/TC | C67L | J. Cohen | ||
| T | 15 | 79 | J Cohen | LRIS | CIT | TC | C67L | J. Cohen | ||
| W | 16 | 71 | N. Vogt, Phillips | LRIS | UCSC | TC | U88L | N. Vogt, Phillips | ||
| Th | 17 | 62 | N. Vogt, Phillips | LRIS | UCSC | TC/JA | U88L | N. Vogt, Phillips | ||
| F | 18 | 53 | N. Vogt, Phillips | LRIS | UCSC | TC/JA | U88L | N. Vogt, Phillips | ||
| Sa | 19 | 44 | Burbidge, Junkkarinen | LRIS | UCSD | JA | U89L | Burbidge | ||
| Su | 20 | 34 | Filip, Leon, Reiss, Vandyk | LRIS | UCB | JA | U90L | Filippenko | ||
| M | 21 | 25 | Engineering | ? | KECK | JA | Engineering | |||
| T | 22 | 16 | Engineering | ? | KECK | JA/WW | Engineering | |||
| W | 23 | 7 | Engineering | ? | KECK | WW | Engineering | |||
| Th | 24 | 0 | Engineering | ? | KECK | WW | Engineering | |||
| F | 25 | 0 | Engineering, Channan, Troy | PCS | KECK | WW | Engineering | |||
| Sa | 26 | 0 | Engineering, Channan, Troy | PCS | KECK | WW/GP | Engineering | |||
| Su | 27 | 2 | Engineering, Channan, Troy | PCS | KECK | GP | Engineering | |||
| M | 28 | 10 | Engineering, Channan, Troy | PCS | KECK | GP | Engineering | |||
| T | 29 | 17 | Engineering, Channan, Troy | PCS | KECK | GP/TC/CS/JA | Engineering | |||
| W | 30 | 25 | Engineering, Channan, Troy | PCS | KECK | GP/BS | Engineering | |||
| Th | 31 | 33 | Engineering | LRIS | KECK | BS | Engineering | |||
| NOTES: OA (Observing Assistant) = JA (Joel Aycock), TC (Teresa Chelminiak), GP (Gary Puniwai), RQ (Ron Quick), BS (Barbara Schaefer), CS (Chuck Sorenson), TS (Terry Stickel), WW (Wayne Wack) | ||||||||||
| IS (Instrument Specialist) = TB (Tom Bida), RC (Randy Campbell), RG (Bob Goodrich), WH (Wendy Harrison) | ||||||||||
| LOC = S (Summit), HQ (HQ Remote), RS (Remote & Summit), RO (Remote Observing Assistant) | ||||||||||
| Codes are institution/proposal#/instrument where C = CIT, U = UC, H = UH, N = NASA, and L =LRIS, H = HIRES, N = NIRC, W = LWS, V = VISITOR | ||||||||||
| HIRESr/b = red/blue cross disperser | ||||||||||
| *Denotes changes made to schedule on 1/27/97 | ||||||||||
| NOVEMBER 1996 | ||||||||||
| Keck 2 Semester 96B | ||||||||||
| Day | Date | % Dark | Observer (s) | LOC | Instr. | Institution | OA | IS | Code | PI |
| F | 1 | 40 | Engineering | LRIS | KECK | BS | Engineering | |||
| Sa | 2 | 48 | Stockton, Ridgway, Canalizo | LRIS | UH | BS/RQ | TB | H22L | Stockton | |
| Su | 3 | 55 | Stockton, Ridgway, Canalizo | LRIS | UH | BS/RQ | H22L | Stockton | ||
| M | 4 | 63 | Filippenko, Leonard | LRIS | UCB | RQ/TS | RC | U92L | Filippenko | |
| T | 5 | 70 | Koo, Guzman, Gallego | HQ | LRIS | UCSC | RQ | RG | U91L | Koo |
| W | 6 | 78 | Koo, Guzman, Gallego | HQ | LRIS | UCSC | RQ | U91L | Koo | |
| Th | 7 | 85 | Djorgovski, Banas | LRIS | CIT | RQ/CS | TB | C68L | Djorgovski | |
| F | 8 | 93 | Djorgovski, Banas | LRIS | CIT | CS | C68L | Djorgovski | ||
| Sa | 9 | 100 | Hu, Cowie/Gioia, Mullis | HQ | LRIS | UH | CS | RG | H23L/H24L | Hu/Gioia |
| Su | 10 | 100 | Hu, Cowie/Gioia, Mullis | LRIS | UH | CS | H23L/H24L | Hu/Gioia | ||
| M | 11 | 97 | Hu, Cowie/Gioia, Mullis | LRIS | UH | CS/TS | H23L/H24L | Hu/Gioia | ||
| T | 12 | 89 | Chaffee, Osmer | HQ | LRIS | KECK | TS | TB | K6L | Chaffee |
| W | 13 | 80 | J Cohen, Blakeslee | LRIS | CIT | TS | RC | C69L | J Cohen | |
| Th | 14 | 72 | J Cohen, Blakeslee | LRIS | CIT | TS | C69L | J Cohen | ||
| F | 15 | 62 | Martin, Halpern, Schiminovich | LRIS | CIT | TS/WW | RC | C70L | Martin | |
| Sa | 16 | 54 | Graham, Dey | LRIS | UCB | WW | TB | U93L | Graham | |
| Su | 17 | 45 | vanKerkwijk, Sandhu | LRIS | CIT | WW | RG | C71L | Kulkarni | |
| M | 18 | 36 | vanKerkwijk, Sandhu | LRIS | CIT | WW | C71L | Kulkarni | ||
| T | 19 | 28 | Engineering | ? | KECK | WW/CS | Engineering | |||
| W | 20 | 19 | Engineering | ? | KECK | CS | Engineering | |||
| Th | 21 | 11 | Engineering | ? | KECK | CS | Engineering | |||
| F | 22 | 2 | Engineering | ? | KECK | CS | Engineering | |||
| Sa | 23 | 0 | Engineering | ? | KECK | CS/TS | Engineering | |||
| Su | 24 | 0 | Engineering | ? | KECK | TS | Engineering | |||
| M | 25 | 0 | Engineering | ? | KECK | TS/RQ | Engineering | |||
| T | 26 | 6 | Engineering | ? | KECK | TS/RQ | Engineering | |||
| W | 27 | 14 | Engineering | ? | KECK | TS/RQ | Engineering | |||
| Th | 28 | 21 | Engineering | ? | KECK | RQ/GP | Engineering | |||
| F | 29 | 28 | Engineering | ? | KECK | RQ/GP | Engineering | |||
| Sa | 30 | 35 | Engineering | ? | KECK | GP | Engineering | |||
| NOTES: OA (Observing Assistant) = JA (Joel Aycock), TC (Teresa Chelminiak), GP (Gary Puniwai), RQ (Ron Quick), BS (Barbara Schaefer), CS (Chuck Sorenson), TS (Terry Stickel), WW (Wayne Wack) | ||||||||||
| IS (Instrument Specialist) = TB (Tom Bida), RC (Randy Campbell), RG (Bob Goodrich), WH (Wendy Harrison) | ||||||||||
| LOC = S (Summit), HQ (HQ Remote), RS (Remote & Summit), RO (Remote Observing Assistant) | ||||||||||
| Codes are institution/proposal#/instrument where C = CIT, U = UC, H = UH, N = NASA, and L =LRIS, H = HIRES, N = NIRC, W = LWS, V = VISITOR | ||||||||||
| HIRESr/b = red/blue cross disperser | ||||||||||
| HOLIDAY: November 28 & 29 (Thanksgiving) | ||||||||||
| *Denotes changes made to schedule on 1/27/97 | ||||||||||
| DECEMBER 1996 | ||||||||||
| Keck 2 Semester 96B | ||||||||||
| Day | Date | % Dark | Observer (s) | LOC | Instr. | Institution | OA | IS | Code | PI |
| Su | 1 | 43 | Malkan | LRIS | UCLA | GP | U94L | Malkan | ||
| M | 2 | 50 | Basri, Rebolo, Zaputero-Osorio | LRIS | UCB | GP/JA | U95L | Basri | ||
| T | 3 | 57 | Basri, Rebolo, Zaputero-Osorio | LRIS | UCB | GP/JA | U95L | Basri | ||
| W | 4 | 64 | Miller | HQ | LRIS | UCSC | GP/JA | U96L | Miller | |
| Th | 5 | 72 | Davis | S | LRIS | UCB | GP/JA | RC | U97L | Davis |
| F | 6 | 80 | Davis | HQ | LRIS | UCB | JA/RQ | U97L | Davis | |
| Sa | 7 | 88 | L Cowie, A Cowie, Hu | HQ | LRIS | UH | RQ | RC | H25L | L Cowie |
| Su | 8 | 96 | Van Breugel | LRISp | UC-IGGP | RQ | RG | U98L | Van Breugel | |
| M | 9 | 100 | Van Breugel | LRISp | UC-IGGP | RQ | U98L | Van Breugel | ||
| T | 10 | 100 | Kulkarni, van Kerkwijk, Gotthelf | LRIS | CIT | RQ/WW | TB | C72L | Kulkarni | |
| W | 11 | 92 | Kulkarni, van Kerkwijk, Gotthelf | LRIS | CIT | WW | C72L | Kulkarni | ||
| Th | 12 | 83 | Djorgovski, Maxfield | LRIS | CIT | WW | RG | C73L | Djorgovski | |
| F | 13 | 74 | J. Cohen for Blandford | LRIS | CIT | WW | RC | C74L | J. Cohen for Blandford | |
| Sa | 14 | 65 | Armus, Murphy | LRIS | CIT | WW/GP | RG | C75L | Armus | |
| Su | 15 | 56 | Becker, Gregg, Blanton, White | S | LRIS | UCD | GP | TB | U99L | Becker |
| M | 16 | 48 | Becker, Gregg, Blanton, White | S | LRIS | UCD | GP | U99L | Becker | |
| T | 17 | 39 | Stauffer, Bachman, et al | LRIS | NASA | GP | RC | N15L | Stauffer | |
| W | 18 | 31 | Shroder, Forbes | LRIS | UC | GP/JA | TB | U104L | Brodie | |
| Th | 19 | 23 | Shroder, Forbes | ? | UC | JA | U104L | Brodie | ||
| F | 20 | 15 | Hillenbrand | ? | UC | JA/TS | TB | U105L | Hillenbrand | |
| Sa | 21 | 7 | Engineering | PCS | KECK | JA/TS | Engineering | |||
| Su | 22 | 0 | Engineering | PCS | KECK | JA/TS | Engineering | |||
| M | 23 | 0 | Engineering | LRIS | KECK | TS | TB | Engineering | ||
| T | 24 | 0 | NIGHT OFF | KECK | NIGHT OFF | |||||
| W | 25 | 1 | NIGHT OFF | KECK | NIGHT OFF | |||||
| Th | 26 | 8 | Engineering | LRIS | KECK | GP | TB | Engineering | ||
| F | 27 | 15 | Kulkarni | LRIS | CIT | GP | TB | C88L | Kulkarni | |
| Sa | 28 | 22 | Kulkarni | LRIS | CIT | GP | C88L | Kulkarni | ||
| Su | 29 | 29 | Kulkarni | LRIS | CIT | GP | C88L | Kulkarni | ||
| M | 30 | 36 | Hu, L Cowie/Eisloffel, Hodapp | HQ/? | LRIS | UH | GP/CS | RG | H26L/H27L | Hu , Eisloffel |
| T | 31 | 43 | Hu, L Cowie/Eisloffel, Hodapp | HQ/? | LRIS | UH | CS | H26L/H27L | Hu , Eisloffel | |
| NOTES: OA (Observing Assistant) = JA (Joel Aycock), TC (Teresa Chelminiak), GP (Gary Puniwai), RQ (Ron Quick), BS (Barbara Schaefer), CS (Chuck Sorenson), TS (Terry Stickel), WW (Wayne Wack) | ||||||||||
| IS (Instrument Specialist) = TB (Tom Bida), RC (Randy Campbell), RG (Bob Goodrich), WH (Wendy Harrison) | ||||||||||
| LOC = S (Summit), HQ (HQ Remote), RS (Remote & Summit), RO (Remote Observing Assistant) | ||||||||||
| Codes are institution/proposal#/instrument where C = CIT, U = UC, H = UH, N = NASA, and L =LRIS, H = HIRES, N = NIRC, W = LWS, V = VISITOR | ||||||||||
| HIRESr/b = red/blue cross disperser | ||||||||||
| HOLIDAY: December 25 & 26 (Christmas) | ||||||||||
| *Denotes changes made to schedule on 1/27/97 | ||||||||||
| JANUARY 1997 | ||||||||||
| Keck 2 Semester 96B | ||||||||||
| Day | Date | % Dark | Observer (s) | LOC | Instr. | Institution | OA | IS | Code | PI |
| W | 1 | 50 | Vacca | LRIS | UH | CS | RG | H26L | Vacca | |
| Th | 2 | 58 | Lubin, Oke | LRIS | CIT | CS | TB | C79L | Oke | |
| F | 3 | 66 | Lubin, Oke | LRIS | CIT | CS/TS | C79L | Oke | ||
| Sa | 4 | 74 | Teplitz, Malkan | HQ | LRIS | UCLA | TS | RC | U100L | Malkan |
| Su | 5 | 83 | Teplitz, Malkan | " | LRISp | UCLA | TS | RG | U100L | Malkan |
| M | 6 | 92 | Martin | LRIS 20 | CIT | TS | RG | C80L | Martin | |
| T | 7 | 100 | van Kerkwijk, Clemens | LRIS 1 | CIT | TS/RQ | TB | C81L | Clemens | |
| W | 8 | 100 | van Kerkwijk, Clemens | LRIS 1 | CIT | RQ | C81L | Clemens | ||
| Th | 9 | 96 | Clowe, Bauer | LRIS 2 | UH | RQ | RG | H27L | Luppino | |
| F | 10 | 87 | Clowe, Bauer | LRIS 2 | UH | RQ | H27L | Luppino | ||
| Sa | 11 | 77 | Hook, Perlmutter, Knop | LRIS 3 | UC-LBL | RQ/CS | RC | U101L | Perlmutter | |
| Su | 12 | 68 | Hook, Perlmutter, Knop | LRIS 3 | UC-LBL | CS | U101L | Perlmutter | ||
| M | 13 | 59 | Metzger, Kundic | LRIS 4 | CIT | CS | RC | C82L | Metzger | |
| T | 14 | 51 | Metzger, Kundic | LRIS 4 | CIT | CS | C82L | Metzger | ||
| W | 15 | 43 | Engineering | LRIS | KECK | CS/JA | Engineering | |||
| Th | 16 | 35 | Engineering | LRIS | KECK | JA | Engineering | |||
| F | 17 | 27 | Engineering | LRIS | KECK | JA | Engineering | |||
| Sa | 18 | 20 | Engineering | LRIS | KECK | JA | Engineering | |||
| Su | 19 | 12 | Engineering | LRIS | KECK | JA/GP | Engineering | |||
| M | 20 | 5 | Engineering | LRIS | KECK | GP | Engineering | |||
| T | 21 | 0 | Gatewood, McMillen, Persinger, Snyder Hale & Hilliard | MAPS | NASA | GP | N15V | Gatewood | ||
| W | 22 | 0 | Gatewood, McMillen, Persinger, Snyder Hale & Hilliard | MAPS | GP | N15V | Gatewood | |||
| Th | 23 | 0 | Gatewood, McMillen, Persinger, Snyder Hale & Hilliard | MAPS | GP/RQ | N15V | Gatewood | |||
| F | 24 | 2 | Engineering | MAPS | KECK | RQ | Engineering | |||
| Sa | 25 | 10 | Engineering | PCS | KECK | " | Engineering | |||
| Su | 26 | 17 | Engineering | PCS | KECK | " | Engineering | |||
| M | 27 | 24 | Engineering | LRIS* | KECK | RQ/JA | Engineering | |||
| T | 28 | 31 | Engineering/Shaklan* | own inst* | KECK | JA | Engineering | |||
| W | 29 | 38 | Shaklan, Clark, Pravdo | own inst | NASA | JA | N16V | Shaklan | ||
| Th | 30 | 45 | Engineering | ? | KECK | JA | Engineering | |||
| F | 31 | 53 | Bolte | LRIS 5 | UCSC | JA/TS | TB* | U102L | Bolte | |
| NOTES: OA (Observing Assistant) = JA (Joel Aycock), TC (Teresa Chelminiak), GP (Gary Puniwai), RQ (Ron Quick), BS (Barbara Schaefer), CS (Chuck Sorenson), TS (Terry Stickel), WW (Wayne Wack) | ||||||||||
| IS (Instrument Specialist) = TB (Tom Bida), RC (Randy Campbell), RG (Bob Goodrich), WH (Wendy Harrison) | ||||||||||
| LOC = S (Summit), HQ (HQ Remote), RS (Remote & Summit), RO (Remote Observing Assistant) | ||||||||||
| Codes are institution/proposal#/instrument where C = CIT, U = UC, H = UH, N = NASA, and L =LRIS, H = HIRES, N = NIRC, W = LWS, V = VISITOR | ||||||||||
| HIRESr/b = red/blue cross disperser | ||||||||||
| HOLIDAY: January 1 (New Year's Day) | ||||||||||
| *Denotes changes made to schedule on 1/27/97 | ||||||||||
| FEBRUARY 1997 | ||||||||||
| Keck 2 Semester 96B | ||||||||||
| Day | Date | % Dark | Observer (s) | LOC | Instr. | Institution | OA | IS | Code | PI |
| Sa | 1 | 62 | Bolte | LRIS 5 | UCSC | TS | U102L | Bolte | ||
| S | 2 | 71 | Spinrad | LRIS 6 | UCB | TS | RG* | U103L | Spinrad | |
| M | 3 | 80 | Spinrad | LRIS 6 | UCB | TS | U103L | Spinrad | ||
| T | 4 | 88 | Kulkarni, Koresko, van Kerkwijk | LRIS 7 | CIT | TS/CS | RC* | C83L | Kulkarni | |
| W | 5 | 97 | Kulkarni, Koresko | LRIS 7 | CIT | CS | C83L | Kulkarni | ||
| Th | 6 | 100 | J Cohen | LRIS 8 | CIT | CS | TB* | C15L | J Cohen | |
| F | 7 | 100 | ||||||||
| Sa | 8 | 90 | ||||||||
| S | 9 | 81 | ||||||||
| M | 10 | 72 | ||||||||
| T | 11 | 63 | ||||||||
| W | 12 | 54 | ||||||||
| Th | 13 | 46 | ||||||||
| F | 14 | 38 | ||||||||
| Sa | 15 | 30 | ||||||||
| S | 16 | 23 | ||||||||
| M | 17 | 15 | ||||||||
| T | 18 | 9 | ||||||||
| W | 19 | 2 | ||||||||
| Th | 20 | 0 | ||||||||
| F | 21 | 0 | ||||||||
| Sa | 22 | 0 | ||||||||
| S | 23 | 4 | ||||||||
| M | 24 | 11 | ||||||||
| T | 25 | 19 | ||||||||
| W | 26 | 27 | ||||||||
| Th | 27 | 34 | ||||||||
| F | 28 | 42 | ||||||||
| NOTES: OA (Observing Assistant) = JA (Joel Aycock), TC (Teresa Chelminiak), GP (Gary Puniwai), RQ (Ron Quick), BS (Barbara Schaefer), CS (Chuck Sorenson), TS (Terry Stickel), WW (Wayne Wack) | ||||||||||
| IS (Instrument Specialist) = TB (Tom Bida), RC (Randy Campbell), RG (Bob Goodrich), WH (Wendy Harrison) | ||||||||||
| LOC = S (Summit), HQ (HQ Remote), RS (Remote & Summit), RO (Remote Observing Assistant) | ||||||||||
| Codes are institution/proposal#/instrument where C = CIT, U = UC, H = UH, N = NASA, and L =LRIS, H = HIRES, N = NIRC, W = LWS, V = VISITOR | ||||||||||
| HIRESr/b = red/blue cross disperser | ||||||||||
| *Denotes changes made to schedule on 1/27/97 | ||||||||||
Last Update: 1/27/97
Name: Barbara Schaefer
Email: bschaefer@keck.hawaii.edu