Who | System | Description | Last Changed | Job Done | Comments |
Initials | Time |
Support | LRIS | **HIGH PRIORITY** Fill LN after arriving in the morning. | 2024-05-16 10:06
| ZT  | 10:00 | fill complete  |
Support | KCWI | **HIGH PRIORITY** Fill RED Dewar LN *AFTER* 9:30am
*CONFIRM SUCCESSFULL FILL COMPLETED AT KCWI INSTRUMENT PLC TOUCHSCREEN*
"Red fill complete, LN2 detected in vent" | 2024-05-16 13:45
| CF  | 13:45 | Red fill complete  |
Support | ESI | **HIGH PRIORITY** Fill LN on arrival -- Cancelled | 2024-05-16 10:46
| CF  | 10:45 | -- Cancelled  |
Support | ESI | **HIGH PRIORITY** Fill LN on arrival -- Cancelled | 2024-05-16 10:46
| CF  | 10:45 | jlyke--ESI off-sky until 2024-05-30 -- Cancelled  |
Support | NIRES | **HIGH PRIORITY** Fill Main Tank LN on arrival | 2024-05-16 15:45
| CF  | 15:45 | Incomplete due to drips  |
Support | K1 Facility | Naz deck Tool Board and Binder checkout | 2024-05-16 09:33
| ZT  | 09:30 | K1 Nazdeck tool board and binder check out complete  |
Support | K1LTAR | Remove launch telescope cover | 2024-05-16 10:16
| ZT  | 10:15 | complete  |
Support | K1 Facility | Facility reset to LOCAL control. | 2024-05-16 10:32
| ZT  | 10:30 | complete  |
Support | K2 Facility | Naz deck Tool Board and Binder checkout | 2024-05-16 10:46
| CF  | 10:45 | Morning check complete  |
Support | K2LTAR | Remove launch telescope cover | 2024-05-16 10:46
| CF  | 10:45 | Complete  |
Support | K2 Facility | Facility reset to LOCAL control. | 2024-05-16 11:43
| CF  | 11:45 | Complete  |
Support | KPF | By 10:00 am verify the 180l dewar in the basement is at least 1/3 full | 2024-05-16 14:42
| JV  | 14:45 | good  |
Support | KPF | After 12:00pm confirm both Red and Green KPF dewars are at least 145 lbs on the K2 control touchscreen. Reset any timeouts | 2024-05-16 14:43
| JV  | 14:45 | Green weight = 150 Red Weight = 150  |
Support | Dome Temps | After 10:00 AM, Set both Dome temps to the MKWS forecasted 8:00 PM temperatures, found here:
http://hokukea.soest.hawaii.edu/forecast/mko/
Please log temps in comments. | 2024-05-16 10:18
| ZT  | 10:15 | 31.1 f  |
Support | DEIMOS | Fill LN in afternoon.*CONFIRM SUCCESSFULL FILL COMPLETED AT DEOMOS INSTRUMENT PLC TOUCHSCREEN* | 2024-05-16 16:00
| CF  | 15:45 | Fill complete.
Liquid off, hose disconected, bandbreak on  |
Support | K1 | Reconfigure K1: change OBaffles from Deployed to Retracted; | 2024-05-16 11:44
| ZT  | 11:45 | Obaffels balance complete, deployed to retracted HORIZON UP +0.2 DOWN -1.0 ZENITH UP +1.2 DOWN -0.2. RIGHT SPIDER 100 LBS LEFT SPIDER 140 LBS. 40 POUNDS REMOVED FROM RIGHT SPIDER  |
Support | K1TBAD | TBAD/TSIM Operational Checkout on K1 | 2024-05-16 10:17
| ZT  | 10:15 | complete  |
Support | K2TBAD | TBAD/TSIM operational Checkout on K2 | 2024-05-16 15:45
| CF  | 15:45 | Incomplete to to drips  |
Support | K1 Facility | Naz deck Tool Board and Binder checkout | 2024-05-16 13:23
| ZT  | 13:15 | K1 Nazdeck tool board and binder check out complete  |
Support | K2 Facility | Naz deck Tool Board and Binder checkout | 2024-05-16 15:46
| CF  | 15:45 | Afternoon check complete  |
Support | K1LGS | K1 LGS Afternoon Checkout | 2024-05-16 15:38
| ZT  | 15:45 | complete  |
Laser Tech | K2LGS | K2 Laser Checkout | 2024-05-16 15:39
| CF  | 15:45 | JL laser check out complete
Laser propogated at horizon and left READY state  |
Support | KPF | K1 Instrument & Guider READY | 2024-05-16 15:40
| ZT  | 10:30 | KPF Instrument guider check and test all complete  |
Support | OSIRIS-LGS | K1 Instrument & Guider READY | 2024-05-16 15:40
| ZT  | 10:30 | OSIRIS-LGS Instrument guider check and test all complete  |
Support | NIRC2-PY | K2 Instrument & Guider READY | 2024-05-16 15:16
| CF  | 15:15 | Guider check and test all complete  |
Support | NIRSPAO | K2 Instrument & Guider READY | 2024-05-16 15:38
| CF  | 15:30 | Guider check and test all complete  |
Support | NIRSPAO-LGS | K2 Instrument & Guider READY | 2024-05-16 15:38
| CF  | 15:45 | Guider check and test all complete  |
Support | HIRESr | K1 Standby Instrument READY | 2024-05-16 15:39
| ZT  | 10:30 | HIRES Instrument guider check and test all complete  |
Support | MOSFIRE | K1 Standby Instrument READY | 2024-05-16 15:39
| ZT  | 10:30 | MOSFIRE Instrument guider check and test all complete  |
Support | NIRES | K2 Standby Instrument READY | 2024-05-16 15:38
| CF  | 15:45 | Guider check and test all complete  |
Support | K1 Telescope | K1 Telescope FOUL WEATHER | 2024-05-16 15:41
| ZT  | 15:45 | K1 Telescope parked dark and released in (FOUL WEATHER) position  |
Support | K2 Telescope | K2 Telescope FOUL WEATHER | 2024-05-16 16:03
| CF  | 16:00 | K2 parked dark in foul weather  |
Support | KPF | At around 2:30 pm, make sure the dewar in the basement has enough for tomorrows fill or at least 1/3 full | 2024-05-16 15:59
| CF  | 15:00 | Dewar at 3/4  |
Support | LRIS | Fill LN after telescope initialization | 2024-05-16 15:17
| DB  | 15:15 | COMPLETE  |
Support | ESI | Fill LN after telescope initialization -- Cancelled | 2024-05-16 10:47
| CF  | 10:45 | jlyke--ESI off-sky until 2024-05-30 -- Cancelled  |