SIAS Web Interface
SIAS Date: 2024-05-16Time of Printout: 16:31
May 2024 (HST)
SunMonTueWedThuFriSat
 
16
 
To ->.
Go to
[hide]
STATUSK1K2
Telescopes
Keck 1 FOUL
WEATHER
Keck 2 FOUL
WEATHER
Scheduled
Instruments
KPF
(kpf1)
READY
OSIRIS-LGS
(osiris3)
READY
NIRC2-PY
(nspec5)
READY
NIRSPAO
(nspec5)
READY
NIRSPAO-LGS
(nspec5)
READY
Standby
Instruments
HIRESr
READY
MOSFIRE
READY
NIRES
READY
Last Update Time: 2024-05-16 16:31 (HST)
SUPPORTK1K2
Observers[Handley, Lee] [Bentley, Chu, Do, Ghez, Do, Chu][Echeverri, Finnerty, Fitzgerald, Horstman, Hsu, Inglis, Mawet, Ruffio, Sanghi, Sappey, Wang, Xin, Xuan, Zhang, Fitzgerald, Gibbs] [Nishiyama, Saida, Takahashi]
SARandy C.
Sherry Y.
Jim L.
OAHeather H.
summit
Rita M.
rem-ops
SWOCShui K.
Summit Support Lead Zach Tadio Christopher Funada
Who System Description Last Changed Job Done Comments
Initials Time
SupportLRIS**HIGH PRIORITY** Fill LN after arriving in the morning.
2024-05-16 10:06
ZT 10:00fill complete 
SupportKCWI**HIGH PRIORITY** Fill RED Dewar LN *AFTER* 9:30am *CONFIRM SUCCESSFULL FILL COMPLETED AT KCWI INSTRUMENT PLC TOUCHSCREEN* "Red fill complete, LN2 detected in vent"
2024-05-16 13:45
CF 13:45Red fill complete 
SupportESI**HIGH PRIORITY** Fill LN on arrival -- Cancelled
2024-05-16 10:46
CF 10:45 -- Cancelled 
SupportESI**HIGH PRIORITY** Fill LN on arrival -- Cancelled
2024-05-16 10:46
CF 10:45jlyke--ESI off-sky until 2024-05-30 -- Cancelled 
SupportNIRES**HIGH PRIORITY** Fill Main Tank LN on arrival
2024-05-16 15:45
CF 15:45Incomplete due to drips 
SupportK1 FacilityNaz deck Tool Board and Binder checkout
2024-05-16 09:33
ZT 09:30K1 Nazdeck tool board and binder check out complete 
SupportK1LTARRemove launch telescope cover
2024-05-16 10:16
ZT 10:15complete 
SupportK1 FacilityFacility reset to LOCAL control.
2024-05-16 10:32
ZT 10:30complete 
SupportK2 FacilityNaz deck Tool Board and Binder checkout
2024-05-16 10:46
CF 10:45Morning check complete 
SupportK2LTARRemove launch telescope cover
2024-05-16 10:46
CF 10:45Complete 
SupportK2 FacilityFacility reset to LOCAL control.
2024-05-16 11:43
CF 11:45Complete 
SupportKPFBy 10:00 am verify the 180l dewar in the basement is at least 1/3 full
2024-05-16 14:42
JV 14:45good 
SupportKPFAfter 12:00pm confirm both Red and Green KPF dewars are at least 145 lbs on the K2 control touchscreen. Reset any timeouts
2024-05-16 14:43
JV 14:45Green weight = 150 Red Weight = 150 
SupportDome TempsAfter 10:00 AM, Set both Dome temps to the MKWS forecasted 8:00 PM temperatures, found here: http://hokukea.soest.hawaii.edu/forecast/mko/ Please log temps in comments.
2024-05-16 10:18
ZT 10:1531.1 f 
SupportDEIMOSFill LN in afternoon.*CONFIRM SUCCESSFULL FILL COMPLETED AT DEOMOS INSTRUMENT PLC TOUCHSCREEN*
2024-05-16 16:00
CF 15:45Fill complete. Liquid off, hose disconected, bandbreak on 
SupportK1Reconfigure K1:
  • change OBaffles from Deployed to Retracted;
  • 2024-05-16 11:44
    ZT 11:45Obaffels balance complete, deployed to retracted HORIZON UP +0.2 DOWN -1.0 ZENITH UP +1.2 DOWN -0.2. RIGHT SPIDER 100 LBS LEFT SPIDER 140 LBS. 40 POUNDS REMOVED FROM RIGHT SPIDER 
    SupportK1TBADTBAD/TSIM Operational Checkout on K1
    2024-05-16 10:17
    ZT 10:15complete 
    SupportK2TBADTBAD/TSIM operational Checkout on K2
    2024-05-16 15:45
    CF 15:45Incomplete to to drips 
    SupportK1 FacilityNaz deck Tool Board and Binder checkout
    2024-05-16 13:23
    ZT 13:15K1 Nazdeck tool board and binder check out complete 
    SupportK2 FacilityNaz deck Tool Board and Binder checkout
    2024-05-16 15:46
    CF 15:45Afternoon check complete 
    SupportK1LGSK1 LGS Afternoon Checkout
    2024-05-16 15:38
    ZT 15:45complete 
    Laser TechK2LGSK2 Laser Checkout
    2024-05-16 15:39
    CF 15:45JL laser check out complete Laser propogated at horizon and left READY state 
    SupportKPFK1 Instrument & Guider READY
    2024-05-16 15:40
    ZT 10:30KPF Instrument guider check and test all complete 
    SupportOSIRIS-LGSK1 Instrument & Guider READY
    2024-05-16 15:40
    ZT 10:30OSIRIS-LGS Instrument guider check and test all complete 
    SupportNIRC2-PYK2 Instrument & Guider READY
    2024-05-16 15:16
    CF 15:15Guider check and test all complete 
    SupportNIRSPAOK2 Instrument & Guider READY
    2024-05-16 15:38
    CF 15:30Guider check and test all complete 
    SupportNIRSPAO-LGSK2 Instrument & Guider READY
    2024-05-16 15:38
    CF 15:45Guider check and test all complete 
    SupportHIRESrK1 Standby Instrument READY
    2024-05-16 15:39
    ZT 10:30HIRES Instrument guider check and test all complete 
    SupportMOSFIREK1 Standby Instrument READY
    2024-05-16 15:39
    ZT 10:30MOSFIRE Instrument guider check and test all complete 
    SupportNIRESK2 Standby Instrument READY
    2024-05-16 15:38
    CF 15:45Guider check and test all complete 
    SupportK1 TelescopeK1 Telescope FOUL WEATHER
    2024-05-16 15:41
    ZT 15:45K1 Telescope parked dark and released in (FOUL WEATHER) position 
    SupportK2 TelescopeK2 Telescope FOUL WEATHER
    2024-05-16 16:03
    CF 16:00K2 parked dark in foul weather 
    SupportKPFAt around 2:30 pm, make sure the dewar in the basement has enough for tomorrows fill or at least 1/3 full
    2024-05-16 15:59
    CF 15:00Dewar at 3/4 
    SupportLRISFill LN after telescope initialization
    2024-05-16 15:17
    DB 15:15COMPLETE 
    SupportESIFill LN after telescope initialization -- Cancelled
    2024-05-16 10:47
    CF 10:45jlyke--ESI off-sky until 2024-05-30 -- Cancelled 
    Last completed
    TBAD task:
    K1: 2024-04-26
    (20 days ago)
    K2: 2024-04-21
    (25 days ago)

    The server is: mysqlserver [readonly mode]

    The datebook is: datebook

    SIAS version 5.3.1