Date: Sunday, 22 June 2003
Configuration: f/15 + tertiary
K2AO + NIRC2
Instrument Requestor
22 June HST
LGS AO + laser A. Contos/R. Lafon
Test name Duration (hr)
Laser (5 hrs):
NGS setup 0.25
summit student tour 0
Alignment 0.25
Focus LGS 0.5
LGS Stability 1
pointing / centering / LSGOMI 1
Beam Quality by Elevation 2
LGS on LBWFS 0 - 0.25
STRAP (2.5 hrs)
STRAP parameters testing 2
STRAP mag limits 0.5
LBWFS (1.75 hrs)
LBWFS image processing components 1.5
LBWFS plate scale 0 - 0.25
Contingency:
WFC loop & gain parameters (MVD) 2
Image gallery targets (DLM) 2