Keck II Engineering Schedule: 2003

MAY 2003
Date
PI
Project
Instrument
Proposal(s)
Plan
Runtime Reports
Wed 14 May A. Contos STRAP TT LGS-AO NIRC2     Nightlog
Sun 18 May

P. Wizinowich

D. LeMignant

R. Campbell

Interferometer

Reconstructors

Phot Zero Pts

PCS - DSM (1/2)

K2-AO (1/4)

NIRC2 (1/4)

   

 

Nightlog

Mon 19 May P. Wizinowich Interferometer DSM     Nightlog
Tue 20 May P. Wizinowich Interferometer DSM     Nightlog
Wed 21 May P. Wizinowich Interferometer DSM     Nightlog
Thu 22 May A. Contos LGS-AO LGS-AO NIRC2     Nightlog
Fri 23 May A. Contos LGS-AO LGS-AO NIRC2     Nightlog
JUNE 2003
Date
PI
Project
Instrument
Proposal(s)
Plan
Runtime Reports
Wed 11 Jun

K. Tsubota

T. Nordin

G. Hill

M. VanDam

DCS SW

PXL SSC

NIRSPEC

K2-AO Opt.

N/A

SSC

NIRSPEC

K2-AO

  11Jun_Plan Nightlog
Sun 15 Jun

R. Campbell

M. VanDam

Photo zero pt

Reconstructor

NIRC2

K2-AO NIRC2

  15Jun_Plan Nightlog
Mon 16 Jun

K. Tsubota

M. VanDam

A. Contos

DCS Release

K2-AO Opt.

LGS-AO

K2-AO

K2-AO NIRC2

(no propagation)

  16Jun_Plan Nightlog
Sun 22 Jun A. Contos LGS-AO LGS-AO NIRC2   22Jun_Plan Nightlog
JULY 2003
Date
PI
Project
Instrument
Proposal(s)
Plan
Runtime Reports
Sat 5 Jul M. Liu (UH)
Science Give Back
NIRC2      
Fri 11 Jul A. Contos LGS-AO

K2AO

SSC

PCS

K2 Pointing

11Jul_Plan Nightlog
Sat 12 Jul G. Smith (CIT)
Science Give Back
NIRSPEC     Nightlog
Sun 13 Jul B. Merline (NASA)
Science Give Back
NIRC2     Nightlog
Mon 14 Jul

P. Wizinowich

W. Dahl

Interferometer

KII Pointing

PCS / DSM

NIRC2 (2nd half)

 

 

 

14Jul Plan

Nightlog
Tue 15 Jul P. Wizinowich Interferometer DSM     Nightlog
Wed 16 Jul P. Wizinowich Interferometer DSM     Nightlog
Thu 17 Jul P. Wizinowich Interferometer DSM     Nightlog
Aug 2003
Date
PI
Project
Instrument
Proposal
Plan
Runtime Report
Wed 6 Aug

P. Wizinowich

A. Contos

Interferometer

LGS

DSM (1st half)

Strap+LBWS+NIRC2

 

lgsAO

 

lgs plan

Nightlog
Thur 7 Aug P. Wizinowich Interferometer DSM     Nightlog
Fri 8 Aug P. Wizinowich Interferometer DSM     Nightlog
Sun 10 Aug A Contos LGS Strap+LBWS+NIRC2 lgsAO lgs plan Nightlog

Sept 2003

Date
PI
Project
Instrument
Proposal
Plan
Runtime Report
Tue 16 Sep

R. Campbell

G. Chanan

E. Johansson

NIRC2 Shakedown

PDS w NIRC2

K2-AO

NIRC2

NIRC2

PDS

Offloading Loop Tests

  Nightlog
Wed 17 Sep A. Contos LGS LGS - AO lgsAO lgs plan Nightlog
Thur 18 Sep A. Contos LGS LGS - AO lgsAO lgs plan

Nightlog

First Light !

Fri 19 Sep A. Contos LGS LGS - AO lgsAO lgs plan Nightlog
Oct 2003
Date
PI
Project
Instrument
Proposal
Plan
Runtime Report
Fri 10 Oct A. Contos LGS LGS - AO lgsAO lgs plan Nightlog
Sat 11 Oct A. Contos LGS LGS - AO lgsAO lgs plan Nightlog
Sun 12 Oct

P. Wizinowich,

M.Van Dam

Interferometer

AO

DSM

NIRC2

 

K2 -AO

  Nightlog
Mon 13 Oct P. Wizinowich Interferometer DSM     Nightlog
Tue 14 Oct P. Wizinowich Interferometer DSM     Nightlog
Wed 15 Oct P. Wizinowich Interferometer DSM     Nightlog