K2 NIRSPEC Procedures 28 December 2000 Edition

114-36-11

If Cold Cycle Refrigeration CCR) system is running, i.e. NIRSPEC is COLD, then follow ALL steps in the procedure.

If NIRSPEC is WARM and the CCRs are off, then you may omit steps in blue lettering.

 

WARNING:

Be expeditious while the CCRs are off: Turning off the NIRSPEC CCRs provides approximately 10 min before the dewar vacuum pressure reaches an unacceptably high value. At that point, either the CCRs need to be powered on or a vacuum pump needs to be pumping on the dewar. Otherwise NIRSPEC will lose vacuum completely and will need to be warmed to ambient, pumped, and then cooled back to operating temperature, a 15 day process.

TOOLS

PERSONNEL

TIME


-K2 NIRSPEC Left Nasmyth AO Installation-

COMPUTER ROOM

TELESCOPE

AO ENCLOSURE

TELESCOPE

RIGHT NASMYTH PLATFORM

COMPUTER ROOM

MECHANICAL ROOM

RIGHT NASMYTH DECK (in parallel with following tasks in the Computer Room)

COMPUTER ROOM (in parallel with the above tasks on the Right Nasmyth Deck)

TELESCOPE

AO ENCLOSURE

MECHANICAL ROOM

AO ENCLOSURE

CONTROL/COMPUTER ROOM

For Instrument Scientist: CONTROL ROOM or ELSEWHERE WITH NETWORK ACCESS



last modified: D. Sprayberry, 2 May 2001