updated 12 Sep 2000 rdc
This is the interface document for the Keck II telescope and AO
Facility to NIRC-2 interfaces. This document covers the opto-mechanical
details associated with both mounting the NIRC-2 system in the AO enclosure
on the Nasmyth platform, and interacting with the AO system for normal
operation. In addition, this will cover electrical power, communication
needs (e.g., ethernet, fiber cables, etc.), cooling, size and space for
electronics, and those maintenance items that impact the design of the
AO enclosure. This document was converted into table form from the original
paragraph form on the Keck AO web page.
|
Location | Drawing /
Spec |
Action
red: action needed green: complete |
Rough Estimate of Manpower
Requirement |
Status |
|---|---|---|---|---|---|
| 1.0 Optics
Keck AO notes, KAON link |
- | _ | _ | - | - |
| AO Bench | KAON 107 | Measure with IR laser
S. Acton |
2 day
2 persons |
TBD | |
| 300mm
from AO bench |
_ | Determine Pupil Stability
S. Acton Study pupil stability problem, Implement solution. S. Acton Test AO system without secondary baffle |
21 days
3 persons 1 day
|
TBD | |
| AO Bench | _ | _ | - | _ | |
| 305mm
above AO |
_ | Measure with IR laser
S. Acton |
see para. 1.1 | TBD | |
| LNAS | _ | _ | - | _ | |
| AO Bench | - | _ | _ | _ | |
| N-2 targ/
AO CCD |
KAON 46 | Need for Active Alignment will be determined
during NIRC2 commissioning
S. Acton R. Campbell |
5 days
2 persons |
_ | |
| AO Bench | _ | Determine position and routing of HV P/S
and lines to lamps
R. Campbell |
2 days
1 person |
_ | |
| _ | _ | _ | _ | _ | |
| AO | ACAD Drawing | _ | _ | _ | |
| LNAS | ACAD Drawing
|
Survey pads relative to AO bench
Preliminary elevation measurements of pads J. Seerveld D. Medeiros T. Saloga |
2 days,
2 persons |
Scheduled for
nov 2000 after Kcam removal 5 Sep 2000 |
|
| LNAS AO enclosure | Installation Procedure | K. Mathews
R. Campbell D. Mederios |
21 days
5 persons |
Upon Delivery
2001 |
|
| _ | < 1000kg | _ | _ | _ | |
| _ | CK 1 ton
2Sp 3ph 130" range |
CARA review design
Install and test prior to dewar delivery D. Medeiros D. McBride |
14 days
3 persons |
review
complete April 2000 |
|
|
_ | AO enclosure drawing | _ | _ | _ |
| _ | Simple Single Line Drawing of NIRC2 Interface | _ | _ | _ | |
| In AO enclosure
near NIRC-2 |
Drawing of E-box options | Determine characteristics of noise / preamp /
cable length
J. Larkin R. Matsuda |
21 days
1-2 persons |
In Process | |
|
|
Electronics Vault | - | Design and Build Interface Panel
R. Campbell R. Matsuda |
5 days
3 persons |
TBD |
| _ | 1.5kW | No UPS
D. Mcbride |
- | _ | |
| Glycol to UCLA rack in AO clean room | 655-C0005
-C0006 |
Install Glycol Module
D. Medeiros Modify NIRC2 exchanger and Spare. Evaluate capacity B. Mason |
10 days
1 person 3 days
|
In Process | |
| _ | EtherNet
SCSI See SW specs |
Run Cables in Tel Wrap | _ | complete | |
| Interface panel in AO Elec. Vault | Fiber & Coax | Run Cables in Tel Wrap | _ | complete | |
| _ | KAON 94 | Review design .
Troubleshoot noise problem.
R. Matsuda J. Larkin |
5 days
2 persons |
June 2000
In Process |
|
|
_ | _ | CARA to provide 3ph
Power (208 VAC) to AO roof and connector to handpaddle D. Mcbride |
5 days
2 persons |
TBD |
| _ | _ | _ | _ | _ | |
| mechanical
room |
_ | Need connectors for speed controller
D. Mcbride |
0.5 days
1 person |
TBD | |
| CCR He Supply/Return | _ | _ | Install lines in Tel Wrap
D. Mcbride Install Ts in AO enclosure D. Mederios |
2 days
1 person |
TBD |
| CCR Head Power | _ | _ | Need to pull one more
cable thru wrap D. Mcbride |
2 days
2 persons |
one cable complete |
| CCR gauges | _ | _ | Evaluate need for gauges
D. Mcbride K. Mathews |
0.5 days
2 persons |
_ |
|
N/A | _ | _ | _ | |
| _ | HEPA Filter System | CARA to create clean environment for NIRC2 dewar
service, either temporary or permanent for AO bench and NIRC2
S. Acton P. Wizinowich D. Mcbride |
21 days
3 persons |
TBD | |
| _ | _ | _ | _ | _ | |
|
Next to dewar | T-connect
KF-40 |
Need for UPS/generator power for pump
D. Mcbride Cold Startup Test K. Mathews |
5 days
2 persons 2 days
|
TBD |
| _ | Software Design Specification Doc | A. Conrad
A. Honey B. Goodrich |
- | _ | |
| 5.1 User Interface | _ | scripts/GUI | Integrate instrument and AO operation for
astronomer. R. Campbell B. Goodrich |
21 days
2 persons |
In Process
(NIRSPEC) |