Mid-March Site Visit (Goodrich)
- Dates: Thursday, March 15th, through March 21st.
- Need seat outside the lab (linux box in Marcin's office?)
- Goals
- Fix problems that have shown up since EE/DT have been retesting commands that were tested during the fall
(see reports and
document)
with syncheck changes and other fixes.
(08mar01 email)
(26mar01 email)
- Test grism scripts (link).
- Test subarrays (link to 12mar emails).
- PMR - release latest version
that Allan has been testing at CARA
- Test lamp commands. (lamp mail)
- Check timing of real time image display (Why is it slow? Does sdiff drop frames?).
- PMR - strobe testing (be cognizant of possible alad_server problem
that occurs when CPU or memory become loaded).
- 27mar01 test results:
Pupil1.gif
Pupil2.gif
- Deliver animatics memory.
- Help with installation of new unix memory?
- Convert alad_server_bin to numbered release system?
(notes)