Mid-March Site Visit (Goodrich)
  1. Dates: Thursday, March 15th, through March 21st.

  2. Need seat outside the lab (linux box in Marcin's office?)

  3. Goals
    1. Fix problems that have shown up since EE/DT have been retesting commands that were tested during the fall (see reports and document) with syncheck changes and other fixes. (08mar01 email) (26mar01 email)
    2. Test grism scripts (link).
    3. Test subarrays (link to 12mar emails).
    4. PMR - release latest version that Allan has been testing at CARA
    5. Test lamp commands. (lamp mail)
    6. Check timing of real time image display (Why is it slow? Does sdiff drop frames?).
    7. PMR - strobe testing (be cognizant of possible alad_server problem that occurs when CPU or memory become loaded).
      1. 27mar01 test results: Pupil1.gif Pupil2.gif
    8. Deliver animatics memory.
    9. Help with installation of new unix memory?
    10. Convert alad_server_bin to numbered release system? (notes)